Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35876
Well Classification: OW Status: PR - 3/1/2023
Well Name/No:NICHOLS #26N-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2023
FacilityID:429714LocationID:429717
County:WELD #123Location:SENE 8 2N65W 6
Field:WATTENBERG - #90750Elevation:4893 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2457FNL  530 FELLat/Long: 40.153788 / -104.680205Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153790 / -104.680209Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/9/2013
End Date: 3/28/2013
Reported: 6/10/2013
Days to report: 74
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2023             Measured TD: 14054 ft.    Vertical TD: 7098 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/26/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 65W Footage: 1944 FNL  108 FEL
Bottom Hole Location:Sec:5 Twp: 2n 65W Footage: 488 FNL  81 FEL
Proposed Depth/Form:13952 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 825 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 825 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7380 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7380 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6381 ft., Depth: 13952 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/12/2012
Spud Date:11/8/2012Spud Date Is:ACTUAL
Measured TD:14054 ft.Measured PB depth:13996 ft.
True Vertical TD:7098 ft.True Vertical PB depth:7100 ft.
Top PZ Location:Sec:8 Twp: 2N 65WFootage: 1944 FNL  108 FEL
Bottom Hole Location:Sec:5 Twp: 2n 65WFootage: 488 FNL  81 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: PCG-DGR, PCD-PCG, EWR-DGR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 851 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 851 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7447 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 728, Top: 1210 ft., Bottom: 7447 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6309 ft., Depth: 14044 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6940 ft.
SHARON SPRINGS6970 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2023                  Interval Top: 7430 ft.    Interval Bottom: 13920 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/21/2013Treatment End Date:3/28/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7430-13920. 6725 BBL LINER GEL, 417 BBL ACID, 42166 BBL CROSSLINK GEL, 109801 BBL SLICKWATER, 159109 BBL TOTAL FLUID. 2020660# 40/70 SAND, 1492220# 30/50 SAND, 112720# 20/40 SAND, 3625600# TOTAL SAND.
Total fluid used in treatment (bbls):159109Max pressure during treatment (psi):7728
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:33
Total acid used in treatment (bbls):417Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17825
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):159109Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7035 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 308
BBLS_OIL 358
BTU_GAS 51
CALC_BBLS_H2O 308
CALC_BBLS_OIL 358
CALC_GOR 3011
CALC_MCF_GAS 1078
CASING_PRESS 2551
GRAVITY_OIL 1279
MCF_GAS 1078
TUBING_PRESS 2026
Perforation Data:
Interval Top:7430 ft.# Of Holes:0
Interval Bottom:13920 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)8638
Total Gas Produced (MCF)113685
GOR13161
GOR DeterminationBOE
Average BOE per Day77.520
Average MCFE per Day449.595

 Federal Financial Assurance  i 

 Tribal Well  i No