Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35870
Well Classification: OW Status: PR - 5/1/2019
Well Name/No:NICHOLS #3N-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2019
FacilityID:429705LocationID:429700
County:WELD #123Location:SENW 8 2N65W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2245FNL  2406 FWLLat/Long: 40.154354 / -104.688559Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.154352 / -104.688565Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2013
End Date: 4/1/2013
Reported: 8/19/2013
Originally Reported: 6/6/2013
Days to report: 140
Days to report: 66
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2019             Measured TD: 13987 ft.    Vertical TD: 7053 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/26/2014
Proposed Top PZ Location:Sec:8 Twp: 2N 65W Footage: 1669 FNL  1892 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65W Footage: 460 FNL  1874 FWL
Proposed Depth/Form:13788 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 825 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 620, Top: 0 ft., Bottom: 825 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7423 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7423 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6420 ft., Depth: 13788 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/31/2013
Spud Date:11/12/2012Spud Date Is:ACTUAL
Measured TD:13987 ft.Measured PB depth:13962 ft.
True Vertical TD:7053 ft.True Vertical PB depth:7052 ft.
Top PZ Location:Sec:8 Twp: 2N 65WFootage: 1930 FNL  2015 FWL
Bottom Hole Location:Sec:5 Twp: 2N 65WFootage: 486 FNL  2071 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR, R; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 888 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 888 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7376 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 228 ft., Bottom: 7376 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6533 ft., Depth: 13971 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7024 ft.
NIOBRARA7123 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2019                  Interval Top: 7442 ft.    Interval Bottom: 13987 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/13/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/29/2013Treatment End Date:4/1/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7442-13987. 31301 BBL CROSSLINK GEL, 1850 BBL LINEAR GEL, 94375 BBL SLICKWATER, 127526 BBL TOTAL FLUID. 40900# 20/40 SAND, 510060# 30/50 SAND, 2523081# 40/70 SAND, 3074041# TOTAL SAND.
Total fluid used in treatment (bbls):127526Max pressure during treatment (psi):7590
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13785
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3074041Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7070 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/25/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 359
BBLS_OIL 390
BTU_GAS 1279
CALC_BBLS_H2O 359
CALC_BBLS_OIL 390
CALC_GOR 2362
CALC_MCF_GAS 921
CASING_PRESS 2486
GRAVITY_OIL 51
MCF_GAS 921
TUBING_PRESS 1956
Perforation Data:
Interval Top:7442 ft.# Of Holes:0
Interval Bottom:13987 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7477
Total Gas Produced (MCF)81919
GOR10956
GOR DeterminationBOE
Average BOE per Day58.838
Average MCFE per Day341.239

 Federal Financial Assurance  i 

 Tribal Well  i No