Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35847
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:RAYMOND #16N-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:429595LocationID:327409
County:WELD #123Location:NENE 29 3N66W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Planned Location:253FNL  1296 FELLat/Long: 40.202410 / -104.796230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202410 / -104.796240Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/28/2013
End Date: 2/28/2013
Reported: 4/24/2013
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 11773 ft.    Vertical TD: 7186 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/12/2014
Proposed Top PZ Location:Sec:29 Twp: 3N 66W Footage: 626 FNL  805 FEL
Bottom Hole Location:Sec:29 Twp: 3N 66W Footage: 460 FSL  775 FEL
Proposed Depth/Form:11739 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7553 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 740, Top: , Bottom: 7553 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6553 ft., Depth: 11739 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/28/2012
Spud Date:8/17/2012Spud Date Is:ACTUAL
Measured TD:11773 ft.Measured PB depth:11754 ft.
True Vertical TD:7186 ft.True Vertical PB depth:7186 ft.
Top PZ Location:Sec:29 Twp: 3N 66WFootage: 574 FNL  826 FEL
Bottom Hole Location:Sec:29 Twp: 3N 66WFootage: 485 S  561 E
Log Types:PRE FORM 5
Log Types:CBL; MWD: (2) NFE-GR; (4) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 938 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 938 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7531 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 100 ft., Bottom: 7531 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6637 ft., Depth: 11763 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7137 ft.
NIOBRARA7541 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2023                  Interval Top: 7599 ft.    Interval Bottom: 11773 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/5/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2013Treatment End Date:2/28/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7599-11773. 6113 BBL CROSSLINK GEL, 905 BBL LINEAR GEL, 74853 BBL SLICKWATER, 81870 BBL TOTAL FLUID. 1857822# 40/70 SAND, 146498# 30/50 SAND, 33316# CRC 20/40 SAND, 2037636# TOTAL SAND.
Total fluid used in treatment (bbls):81870Max pressure during treatment (psi):7423
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10273
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2037636Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7205 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/23/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 245
BBLS_OIL 364
BTU_GAS 1256
CALC_BBLS_H2O 245
CALC_BBLS_OIL 364
CALC_GOR 2343
CALC_MCF_GAS 853
CASING_PRESS 1739
GRAVITY_OIL 48
MCF_GAS 853
TUBING_PRESS 1300
Perforation Data:
Interval Top:7599 ft.# Of Holes:0
Interval Bottom:11773 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)5020
Total Gas Produced (MCF)51607
GOR10280
GOR DeterminationBOE
Average BOE per Day38.005
Average MCFE per Day220.421

 Federal Financial Assurance  i 

 Tribal Well  i No