Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35833
Well Classification: OW Status: PR - 6/1/2019
Well Name/No:VAN PORTFLIET #38N-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:429564LocationID:429563
County:WELD #123Location:SWSW 10 2N65W 6
Field:WATTENBERG - #90750Elevation:4862 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:300FSL  1000 FWLLat/Long: 40.146799 / -104.656053Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146796 / -104.656056Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2013
End Date: 1/16/2013
Reported: 3/11/2013
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2019             Measured TD: 11985 ft.    Vertical TD: 6941 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/9/2014
Proposed Top PZ Location:Sec:10 Twp: 2N 65W Footage: 659 FSL  301 FWL
Bottom Hole Location:Sec:10 Twp: 2N 65W Footage: 1 FNL  318 FWL
Proposed Depth/Form:11987 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7328 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 7328 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6293 ft., Depth: 11987 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/19/2012
Spud Date:9/14/2012Spud Date Is:ACTUAL
Measured TD:11985 ft.Measured PB depth:11961 ft.
True Vertical TD:6941 ft.True Vertical PB depth:6941 ft.
Top PZ Location:Sec:10 Twp: 2N 65WFootage: 659 FSL  301 FWL
Bottom Hole Location:Sec:10 Twp: 2N 65WFootage: 1 FNL  318 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR, R; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 930 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 930 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7364 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 470 ft., Bottom: 7364 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6410 ft., Depth: 11970 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7008 ft.
NIOBRARA7139 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2019                  Interval Top: 7414 ft.    Interval Bottom: 11970 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/15/2013Treatment End Date:1/16/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7414-11970. 10330 BBL CROSSLINK GEL, 977 BBL LINEAR GEL, 56223 BBL SLICKWATER, 67530 BBL TOTAL FLUID. 1799304# 40/70 SAND, 290937# 30/50 SAND, 22566# 20/40 SAND, 2112807# TOTAL SAND.
Total fluid used in treatment (bbls):67530Max pressure during treatment (psi):7481
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5976
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2112807Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6898 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 217
BBLS_OIL 146
BTU_GAS 1237
CALC_BBLS_H2O 217
CALC_BBLS_OIL 146
CALC_GOR 3411
CALC_MCF_GAS 498
CASING_PRESS 1417
GRAVITY_OIL 50
MCF_GAS 498
TUBING_PRESS 639
Perforation Data:
Interval Top:7414 ft.# Of Holes:0
Interval Bottom:11970 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1419
Total Gas Produced (MCF)33594
GOR23674
GOR DeterminationMCFE
Average BOE per Day19.757
Average MCFE per Day114.580

 Federal Financial Assurance  i 

 Tribal Well  i No