Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35795
Well Classification: OW Status: PR - 1/27/2013
Well Name/No:CANNON #13N-3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/27/2013
FacilityID:429376LocationID:429361
County:WELD #123Location:NWNW 3 2N65W 6
Field:WATTENBERG - #90750Elevation:4840 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:249FNL  1109 FWLLat/Long: 40.173960 / -104.655184Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.173968 / -104.655190Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2012
End Date: 12/21/2012
Reported: 2/12/2013
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/27/2013             Measured TD: 10978 ft.    Vertical TD: 6918 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/27/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/21/2014
Proposed Top PZ Location:Sec:3 Twp: 2N 65W Footage: 1250 FNL  535 FWL
Bottom Hole Location:Sec:3 Twp: 2N 65W Footage: 460 FSL  520 FWL
Proposed Depth/Form:10756 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 775 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 580, Top: 0 ft., Bottom: 775 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7309 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7309 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6361 ft., Depth: 10756 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/17/2012
Spud Date:7/8/2012Spud Date Is:ACTUAL
Measured TD:10978 ft.Measured PB depth:10949 ft.
True Vertical TD:6918 ft.True Vertical PB depth:6919 ft.
Top PZ Location:Sec:3 Twp: 2N 65WFootage: 857 FNL  548 FWL
Bottom Hole Location:Sec:3 Twp: 2N 65WFootage: 680 FSL  465 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: PCDC-DGR, PCDC-PCGK, EWR-PCDC-DGR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 819 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 819 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7355 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 250 ft., Bottom: 7355 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6389 ft., Depth: 10958 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA
SHARON SPRINGS7028 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/27/2013                 Interval Top: 7393 ft.    Interval Bottom: 10978 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/11/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/20/2012Treatment End Date:12/21/2012
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7393-10978. 9695 BBL PERMSTIM 45#, 798 BBL LINEAR GEL, 56895 BBL FR WATER, 67387 BBL TOTAL FLUID. 1440360# OTTAWA 40/70 SAND, 301000# OTTAWA 30/50 SAND, 24040# CRC 20/40 SAND, 1765400# TOTAL SAND.
Total fluid used in treatment (bbls):67387Max pressure during treatment (psi):7191
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4337
Fresh water used in treatment (bbls):56895Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1765400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6923 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 108
BBLS_OIL 304
BTU_GAS 1251
CALC_BBLS_H2O 108
CALC_BBLS_OIL 304
CALC_GOR 2737
CALC_MCF_GAS 832
CASING_PRESS 2327
GRAVITY_OIL 50
MCF_GAS 832
TUBING_PRESS 1530
Perforation Data:
Interval Top:7393 ft.# Of Holes:0
Interval Bottom:10978 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)556
Total Gas Produced (MCF)3292
GOR5920
GOR DeterminationBOE
Average BOE per Day3.064
Average MCFE per Day17.767

 Federal Financial Assurance  i 

 Tribal Well  i No