|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2025 Measured TD: 11477 ft. Vertical TD: 7121 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/21/2014 | | Proposed Top PZ Location: | Sec:3 Twp: 2N 65W | Footage: 641 FNL 336 FEL | | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 487 FSL 153 FEL | | Proposed Depth/Form: | 11523 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 775 ft., Weight: 36.0 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 775 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7485 ft., Weight: 26.0 , Citings Type: PLANNED | | Cement: | Sacks: 740, Top: , Bottom: 7485 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6453 ft., Depth: 11523 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/14/2012 | | Spud Date: | 7/18/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11477 ft. | Measured PB depth: | 11131 ft. | | True Vertical TD: | 7121 ft. | True Vertical PB depth: | 7121 ft. | | Top PZ Location: | Sec:3 Twp: 2N 65W | Footage: 641 FNL 336 FEL | | Bottom Hole Location: | Sec:3 Twp: 2N 65W | Footage: 487 FSL 153 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CBL; LWD: TC-MD, ADI-MD, SGRI-MD, SGRR-MD; MUD | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 818 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 0 ft., Bottom: 818 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7460 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 510 ft., Bottom: 7460 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6192 ft., Depth: 11140 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 6896 ft. | | | | | NIOBRARA | 7078 ft. | | | | | FORT HAYS | 7311 ft. | | | | | CODELL | 7382 ft. | | | |
Formation CODL Formation Classification: GW Status: PR - 12/1/2025 Interval Top: 7392 ft. Interval Bottom: 11477 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/14/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/13/2012 | Treatment End Date: | 12/14/2012 | | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7392-11477.
10420 BBL PERMSTIM 45#, 1123 BBL LINEAR GEL, 57572 BBL FR WATER, 69114 BBL TOTAL FLUID.
1379645# OTTAWA 40/70 SAND, 303366# OTTAWA 30/50 SAND, 33632# CRC 20/40 SAND, 1716643# TOTAL SAND. | | Total fluid used in treatment (bbls): | 69114 | Max pressure during treatment (psi): | 6215 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 1.00 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 5228 | | Fresh water used in treatment (bbls): | 57572 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 1716643 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7092 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/25/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 200 | | BTU_GAS | 1234 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 200 | | CALC_GOR | 3750 | | CALC_MCF_GAS | 750 | | CASING_PRESS | 1558 | | GRAVITY_OIL | 50 | | MCF_GAS | 750 | | TUBING_PRESS | 946 |
| | Perforation Data: | | Interval Top: | 7392 ft. | # Of Holes: | 0 | | Interval Bottom: | 11477 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 74 |
| Total Gas Produced (MCF) | 1252 |
| GOR | 16918 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.780 |
| Average MCFE per Day | 4.519 |
| Federal Financial Assurance | i | |
|
|