Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35771
Well Classification: OW Status: PR - 6/1/2019
Well Name/No:THOMASON #27N-E9HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:429254LocationID:419956
County:WELD #123Location:SESE 9 2N65W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:294FSL  318 FELLat/Long: 40.146790 / -104.660771Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146787 / -104.660772Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/9/2013
End Date: 2/9/2013
Reported: 4/10/2013
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2019             Measured TD: 11549 ft.    Vertical TD: 6953 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2019
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:6/11/2014
Proposed Top PZ Location:Sec:9 Twp: 2N 65W Footage: 597 FSL  880 FEL
Bottom Hole Location:Sec:9 Twp: 2N 65W Footage: 484 FNL  912 FEL
Proposed Depth/Form:11549 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 890 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 890 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7350 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 7350 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6322 ft., Depth: 12865 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/11/2012
Spud Date:9/24/2012Spud Date Is:ACTUAL
Measured TD:11549 ft.Measured PB depth:11515 ft.
True Vertical TD:6953 ft.True Vertical PB depth:6953 ft.
Top PZ Location:Sec:9 Twp: 2N 65WFootage: 597 FSL  880 FEL
Bottom Hole Location:Sec:9 Twp: 2N 65WFootage: 484 FNL  912 FEL
Log Types:PRE FORM 5
Log Types:CBL; PPC; GR; (2) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7343 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 706, Top: 550 ft., Bottom: 7343 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6438 ft., Depth: 11524 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6959 ft.
NIOBRARA7050 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2019                  Interval Top: 7399 ft.    Interval Bottom: 11549 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/7/2013Treatment End Date:2/9/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7399-11549. 6405 BBL CROSSLINK GEL, 374 BBL LINEAR GEL, 74839 BBL SLICKWATER, 81618 BBL TOTAL FLUID. 1863890# OTTAWA 40/70 SAND, 167260# OTTAWA 30/50 SAND, 25300# SUPER LC 20/40 SAND, 2056450# TOTAL SAND.
Total fluid used in treatment (bbls):81618Max pressure during treatment (psi):7495
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10304
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2056450Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6968 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 182
BBLS_OIL 421
BTU_GAS 1247
CALC_BBLS_H2O 182
CALC_BBLS_OIL 421
CALC_GOR 3404
CALC_MCF_GAS 1433
CASING_PRESS 2107
GRAVITY_OIL 48
MCF_GAS 1433
TUBING_PRESS 1694
Perforation Data:
Interval Top:7399 ft.# Of Holes:0
Interval Bottom:11549 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3508
Total Gas Produced (MCF)50640
GOR14435
GOR DeterminationBOE
Average BOE per Day33.547
Average MCFE per Day194.571

 Federal Financial Assurance  i 

 Tribal Well  i No