Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35759
Well Classification: GW Status: PR - 2/6/2013
Well Name/No:THOMASON #14N-15HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/6/2013
FacilityID:429237LocationID:429235
County:WELD #123Location:NENW 15 2N65W 6
Field:WATTENBERG - #90750Elevation:4863 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:248FNL  1421 FWLLat/Long: 40.145290 / -104.654567Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.145294 / -104.654570Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/19/2013
End Date: 1/19/2013
Reported: 3/14/2013
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/6/2013             Measured TD: 11560 ft.    Vertical TD: 7021 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/6/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2014
Proposed Top PZ Location:Sec:15 Twp: 2N 65W Footage: 620 FNL  1875 FWL
Bottom Hole Location:Sec:15 Twp: 2N 65W Footage: 460 FSL  1875 FWL
Proposed Depth/Form:11506 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 760 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 760 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7274 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7274 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6256 ft., Depth: 11506 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/3/2012
Spud Date:7/6/2012Spud Date Is:ACTUAL
Measured TD:11560 ft.Measured PB depth:11542 ft.
True Vertical TD:7021 ft.True Vertical PB depth:7020 ft.
Top PZ Location:Sec:15 Twp: 2N 65WFootage: 652 FNL  2129 FWL
Bottom Hole Location:Sec:15 Twp: 2N 65WFootage: 492 FSL  2141 FWL
Log Types:PRE FORM 5
Log Types:CBL; GR; MPR-GR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 809 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 809 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7387 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 699, Top: 830 ft., Bottom: 7387 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6390 ft., Depth: 11550 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6907 ft.
NIOBRARA7009 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 2/6/2013                  Interval Top: 7448 ft.    Interval Bottom: 11560 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/30/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/17/2013Treatment End Date:1/19/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7448-11560. 10139 BBL CROSSLINK GEL, 2744 BBL LINEAR GEL, 88771 BBL SLICKWATER, 101654 BBL TOTAL FLUID. 2197400# JOHNSTOWN 40/70 SAND, 307000# JOHNSTOWN 40/70 SAND, 24600# BRIGHTON 20/40 SAND, 2529001# TOTAL SAND.
Total fluid used in treatment (bbls):101654Max pressure during treatment (psi):7494
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3989
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2529001Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6387 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 374
BTU_GAS 1247
CALC_BBLS_OIL 374
CALC_GOR 1476
CALC_MCF_GAS 552
CASING_PRESS 1928
GRAVITY_OIL 48
MCF_GAS 552
TUBING_PRESS 1480
Perforation Data:
Interval Top:7448 ft.# Of Holes:0
Interval Bottom:11560 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)706
Total Gas Produced (MCF)18831
GOR26672
GOR DeterminationMCFE
Average BOE per Day10.834
Average MCFE per Day62.832

 Federal Financial Assurance  i 

 Tribal Well  i No