Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35740
Well Classification: OW Status: PR - 11/1/2018
Well Name/No:NICHOLS #16N-31HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2018
FacilityID:429188LocationID:429182
County:WELD #123Location:SESE 6 2N65W 6
Field:WATTENBERG - #90750Elevation:4925 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:346FSL  1292 FELLat/Long: 40.161370 / -104.701698Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.161370 / -104.701699Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/1/2013
End Date: 4/1/2013
Reported: 6/6/2013
Days to report: 66
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/1/2018             Measured TD: 11278 ft.    Vertical TD: 7066 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/5/2014
Proposed Top PZ Location:Sec:6 Twp: 2N 65N Footage: 692 FSL  830 FEL
Bottom Hole Location:Sec:6 Twp: 2N 65N Footage: 694 FNL  833 FEL
Proposed Depth/Form:12274 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7421 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 700, Top: , Bottom: 7421 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6391 ft., Depth: 12274 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/18/2012
Spud Date:10/11/2012Spud Date Is:ACTUAL
Measured TD:11278 ft.Measured PB depth:11171 ft.
True Vertical TD:7066 ft.True Vertical PB depth:7066 ft.
Top PZ Location:Sec:6 Twp: 2N 65NFootage: 692 FSL  830 FEL
Bottom Hole Location:Sec:6 Twp: 2N 65NFootage: 694 FNL  833 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: NFE-GR, NFE-MPR-GR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 921 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.75 in., Size: 7 in., Top: 0 ft., Depth: 7478 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 370 ft., Bottom: 7478 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6501 ft., Depth: 11180 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7090 ft.
NIOBRARA7235 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2018                 Interval Top: 7545 ft.    Interval Bottom: 11278 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/1/2013Treatment End Date:4/2/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7545-11278. 9677 BBL CROSSLINK GEL, 944 BBL LINEAR GEL, 57096 BBL SLICKWATER, 67617 BBL TOTAL FLUID, 1322456# 40/70 SAND, 305078# 30/50 SAND, 27242# 20/40 SAND, 1654776# TOTAL SAND.
Total fluid used in treatment (bbls):67617Max pressure during treatment (psi):7191
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):8303
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1654776Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7027 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 250
BBLS_OIL 272
BTU_GAS 1279
CALC_BBLS_H2O 250
CALC_BBLS_OIL 272
CALC_GOR 2904
CALC_MCF_GAS 790
CASING_PRESS 2467
GRAVITY_OIL 51
MCF_GAS 790
TUBING_PRESS 1785
Perforation Data:
Interval Top:7545 ft.# Of Holes:0
Interval Bottom:11278 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2516
Total Gas Produced (MCF)39176
GOR15570
GOR DeterminationMCFE
Average BOE per Day25.361
Average MCFE per Day147.095

 Federal Financial Assurance  i 

 Tribal Well  i No