|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2025 Measured TD: 11495 ft. Vertical TD: 7067 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/30/2014 | | Proposed Top PZ Location: | Sec:6 Twp: 1N 64W | Footage: 646 FNL 1487 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 64W | Footage: 472 FSL 1480 FWL | | Proposed Depth/Form: | 11542 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1020 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 198, Top: 0 ft., Bottom: 1020 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7396 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 903, Top: 500 ft., Bottom: 7396 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11542 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 366, Top: 7096 ft., Bottom: 11542 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/8/2012 | | Spud Date: | 8/2/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 11495 ft. | Measured PB depth: | 11435 ft. | | True Vertical TD: | 7067 ft. | True Vertical PB depth: | 7065 ft. | | Top PZ Location: | Sec:6 Twp: 1N 64W | Footage: 646 FNL 1487 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 64W | Footage: 472 FSL 1480 FWL | | Log Types: | Isolation Scanner Cement Evaluation Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1045 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 362, Top: 0 ft., Bottom: 1045 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7410 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 1050 ft., Bottom: 7410 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11479 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6450 ft., Bottom: 11479 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4356 ft. | | | | | SHANNON | 4929 ft. | | | | | SHARON SPRINGS | 6833 ft. | | | | | NIOBRARA | 6857 ft. | | | | | TEEPEE BUTTES | 6873 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2025 Interval Top: 7496 ft. Interval Bottom: 11475 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/19/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7230 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/19/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 476 | | BBLS_OIL | 28 | | BTU_GAS | 1408 | | CALC_BBLS_H2O | 476 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 1714 | | CALC_MCF_GAS | 48 | | CASING_PRESS | 1685 | | GRAVITY_OIL | 43 | | MCF_GAS | 48 | | TUBING_PRESS | 743 |
| | Perforation Data: | | Interval Top: | 7496 ft. | # Of Holes: | 727 | | Interval Bottom: | 11475 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 674 |
| Total Gas Produced (MCF) | 685 |
| GOR | 1016 |
| GOR Determination | BOE |
| Average BOE per Day | 2.134 |
| Average MCFE per Day | 12.363 |
| Federal Financial Assurance | i | |
|
|