Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35595
Well Classification: OW Status: PR - 5/1/2023
Well Name/No:SARCHET #15N-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2023
FacilityID:428938LocationID:428939
County:WELD #123Location:NWNE 32 3N66W 6
Field:WATTENBERG - #90750Elevation:4914 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:305FNL  2386 FELLat/Long: 40.187712 / -104.800145Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.187712 / -104.800150Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/9/2012
End Date: 11/9/2012
Reported: 12/12/2012
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2023             Measured TD: 11611 ft.    Vertical TD: 7215 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/16/2014
Proposed Top PZ Location:Sec:33 Twp: 3N 66W Footage: 837 FNL  1952 FEL
Bottom Hole Location:Sec:33 Twp: 3N 66W Footage: 488 FSL  1925 FEL
Proposed Depth/Form:11700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7531 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 7531 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6507 ft., Depth: 11700 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/27/2012
Spud Date:9/5/2012Spud Date Is:ACTUAL
Measured TD:11611 ft.Measured PB depth:11592 ft.
True Vertical TD:7215 ft.True Vertical PB depth:7214 ft.
Top PZ Location:Sec:33 Twp: 3N 66WFootage: 837 FNL  1952 FEL
Bottom Hole Location:Sec:33 Twp: 3N 66WFootage: 488 FSL  1925 FEL
Log Types:PRE FORM 5
Log Types:CBL; LWD; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 800 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7658 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 680 ft., Bottom: 7658 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6585 ft., Depth: 11596 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7182 ft.
NIOBRARA7331 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2023                  Interval Top: 7717 ft.    Interval Bottom: 11611 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/7/2012Treatment End Date:11/9/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7717-11611. 2001220# 40/70 SAND, 301684# 30/50 SAND, 25960# SUPER LC, 2328864# TOTAL SAND. Perforated 7325-7328, 3 holes, size .4 to relieve potential trapped pressure between 4-1/2” liner and 7” intermediate casing below liner top above cased hole packer as a result of setting liner top and cased hole packer with cool fluid in annular space.
Total fluid used in treatment (bbls):97233Max pressure during treatment (psi):6974
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):62299
Fresh water used in treatment (bbls):82833Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2328864Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7166 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/29/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 405
BTU_GAS 1209
CALC_BBLS_OIL 405
CALC_GOR 1959
CALC_MCF_GAS 794
CASING_PRESS 2402
GRAVITY_OIL 50
MCF_GAS 794
TUBING_PRESS 1495
Perforation Data:
Interval Top:7717 ft.# Of Holes:0
Interval Bottom:11611 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)858
Total Gas Produced (MCF)25409
GOR29614
GOR DeterminationMCFE
Average BOE per Day14.266
Average MCFE per Day82.751

 Federal Financial Assurance  i 

 Tribal Well  i No