Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35561
Well Classification: OW Status: PA - 6/21/2021
Well Name/No:Thomsen USX #X07-28D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/21/2021
FacilityID:428876LocationID:428867
County:WELD #123Location:SWSW 6 2N65W 6
Field:WATTENBERG - #90750Elevation:4976 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1071FSL  871 FWLLat/Long: 40.163170 / -104.712730Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.163180 / -104.712740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2012
End Date: 8/13/2012
Reported: 8/24/2012
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/21/2021             Measured TD: 8325 ft.    Vertical TD: 7989 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/21/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/9/2014
Proposed Top PZ Location:Sec:6 Twp: 2N 65W Footage: 243 FSL  2456 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65W Footage: 253 FSL  2425 FWL
Proposed Depth/Form:8311 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 328, Top: 0 ft., Bottom: 960 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8311 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 733, Top: , Bottom: 8311 ft.

Wellbore Completed
Completion Date:7/16/2012
Spud Date:7/10/2012Spud Date Is:ACTUAL
Measured TD:8325 ft.Measured PB depth:8266 ft.
True Vertical TD:7989 ft.True Vertical PB depth:7930 ft.
Top PZ Location:Sec:6 Twp: 2N 65WFootage: 243 FSL  2456 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65WFootage: 253 FSL  2425 FWL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1037 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 1037 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2342 ft., Depth: 8312 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 3170 ft., Bottom: 8312 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE688 ft.
PARKMAN4234 ft.
SUSSEX4925 ft.
SHANNON5708 ft.
NIOBRARA7465 ft.
CODELL7685 ft.
J SAND8133 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/21/2021                 Interval Top: 8134 ft.    Interval Bottom: 8187 ft.

 Completed Information for Formation J SAND
1st Production Date:8/23/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2012Treatment End Date:8/13/2012
Treatment Summary:PUMPED 271492# Ottawa sand in 162809gals of Clearstar, Gelled Water, Slick Water, 15% HCL downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3876Max pressure during treatment (psi):3703
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.59
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):451
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):271492Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8134 ft.# Of Holes:120
Interval Bottom:8187 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7686 ft.    Interval Bottom: 7700 ft.

 Completed Information for Formation CODELL
1st Production Date:8/23/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2012Treatment End Date:8/13/2012
Treatment Summary:PUMPED 234957# Ottawa sand in 128074gals of Clearstar, Gelled Water, Slick Water, 15% HCL downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3049Max pressure during treatment (psi):5264
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):451
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):234957Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7686 ft.# Of Holes:56
Interval Bottom:7700 ft.Hole Size:0.4 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/29/2012                 Interval Top: 7531 ft.    Interval Bottom: 8187 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/23/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/29/2012Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 45
BTU_GAS 1283
CALC_BBLS_H2O 6
CALC_BBLS_OIL 45
CALC_GOR 2444
CALC_MCF_GAS 110
CASING_PRESS 658
GRAVITY_OIL 49
MCF_GAS 110
Perforation Data:
Interval Top:7531 ft.# Of Holes:212
Interval Bottom:8187 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/21/2021                 Interval Top: 7531 ft.    Interval Bottom: 7700 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/23/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2013Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7531 ft.# Of Holes:92
Interval Bottom:7700 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7531 ft.    Interval Bottom: 7549 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/23/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/12/2012Treatment End Date:8/10/2012
Treatment Summary:PUMPED 247804# Ottawa sand in 171557gals of Clearstar, Gelled Water, Slick Water, Fresh Water downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):4085Max pressure during treatment (psi):5925
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):451
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):247804Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7531 ft.# Of Holes:36
Interval Bottom:7549 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/21/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No