Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35560
Well Classification: OW Status: SI - 7/1/2020
Well Name/No:Rehder #X06-33D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2020
FacilityID:428875LocationID:428867
County:WELD #123Location:SWSW 6 2N65W 6
Field:WATTENBERG - #90750Elevation:4979 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1075FSL  759 FWLLat/Long: 40.163170 / -104.713130Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.163180 / -104.713140Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2012
End Date: 7/29/2012
Reported: 9/28/2012
Days to report: 61
Disclosure: Sidetrack #00
Start Date: 8/9/2012
End Date: 8/9/2012
Reported: 8/24/2012
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2020             Measured TD: 8080 ft.    Vertical TD: 8004 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/9/2014
Proposed Top PZ Location:Sec:6 Twp: 2N 65W Footage: 1287 FSL  70 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65W Footage: 1281 FSL  60 FWL
Proposed Depth/Form:8050 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 328, Top: 0 ft., Bottom: 960 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8050 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 698, Top: , Bottom: 8050 ft.

Wellbore Completed
Completion Date:6/15/2012
Spud Date:6/14/2012Spud Date Is:ACTUAL
Measured TD:8080 ft.Measured PB depth:8021 ft.
True Vertical TD:8004 ft.True Vertical PB depth:7945 ft.
Top PZ Location:Sec:6 Twp: 2N 65WFootage: 1287 FSL  70 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65WFootage: 1281 FSL  60 FWL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1030 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 393, Top: 0 ft., Bottom: 1030 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 8067 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 2950 ft., Bottom: 8067 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1301 ft.
PARKMAN4125 ft.
SUSSEX4494 ft.
SHANNON5064 ft.
NIOBRARA7243 ft.
FORT HAYS7436 ft.
CODELL7458 ft.
J SAND7903 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 7/1/2020                  Interval Top: 7907 ft.    Interval Bottom: 7951 ft.

 Completed Information for Formation J SAND
1st Production Date:8/21/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/24/2012Treatment End Date:7/24/2012
Treatment Summary:PUMPED 278460# OTTAWA SAND and 22277# Super LC DOWNHOLE in 165522gals of Clearstar/GELLED/SLICK/RECYCLED WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):3941Max pressure during treatment (psi):3722
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):321Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3620Disposition method For flowback:RECYCLE
Total proppant used (lbs):300737Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7907 ft.# Of Holes:104
Interval Bottom:7951 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/24/2013                 Interval Top: 7460 ft.    Interval Bottom: 7476 ft.

 Completed Information for Formation CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/24/2012Treatment End Date:7/29/2012
Treatment Summary:PUMPED 127164# OTTAWA SAND DOWNHOLE in 137970gals of Clearstar/GELLED/SLICK/RECYCLED WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):3285Max pressure during treatment (psi):4930
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):138Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3147Disposition method For flowback:RECYCLE
Total proppant used (lbs):127164Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7460 ft.# Of Holes:64
Interval Bottom:7476 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/27/2012                 Interval Top: 7276 ft.    Interval Bottom: 7951 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/27/2012Treatment End Date:N/A
Treatment Summary:CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 109
BBLS_OIL 162
BTU_GAS 1244
CALC_BBLS_H2O 109
CALC_BBLS_OIL 162
CALC_GOR 3414
CALC_MCF_GAS 553
CASING_PRESS 341
GRAVITY_OIL 51
MCF_GAS 553
Perforation Data:
Interval Top:7276 ft.# Of Holes:216
Interval Bottom:7951 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 6/1/2019                  Interval Top: 7276 ft.    Interval Bottom: 7476 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:5/24/2013Treatment End Date:N/A
Treatment Summary:CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7276 ft.# Of Holes:112
Interval Bottom:7476 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/24/2013                 Interval Top: 7276 ft.    Interval Bottom: 7360 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/24/2012Treatment End Date:8/9/2012
Treatment Summary:PUMPED 244954# OTTAWA SAND DOWNHOLE in 202712gals of Vistar/GELLED/SLICK/RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):4826Max pressure during treatment (psi):4611
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):264Total flowback volume recovered (bbls):949
Fresh water used in treatment (bbls):4562Disposition method For flowback:RECYCLE
Total proppant used (lbs):244954Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7276 ft.# Of Holes:48
Interval Bottom:7360 ft.Hole Size:0.73 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2020
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No