|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2020 Measured TD: 8080 ft. Vertical TD: 8004 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/9/2014 | | Proposed Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 1287 FSL 70 FWL | | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 1281 FSL 60 FWL | | Proposed Depth/Form: | 8050 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 328, Top: 0 ft., Bottom: 960 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8050 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 698, Top: , Bottom: 8050 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/15/2012 | | Spud Date: | 6/14/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8080 ft. | Measured PB depth: | 8021 ft. | | True Vertical TD: | 8004 ft. | True Vertical PB depth: | 7945 ft. | | Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 1287 FSL 70 FWL | | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 1281 FSL 60 FWL | | Log Types: | CBL
TRIPLE COMBO | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1030 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 393, Top: 0 ft., Bottom: 1030 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 8067 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 2950 ft., Bottom: 8067 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1301 ft. | | | | | PARKMAN | 4125 ft. | | | | | SUSSEX | 4494 ft. | | | | | SHANNON | 5064 ft. | | | | | NIOBRARA | 7243 ft. | | | | | FORT HAYS | 7436 ft. | | | | | CODELL | 7458 ft. | | | | | J SAND | 7903 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2020 Interval Top: 7907 ft. Interval Bottom: 7951 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/21/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/24/2012 | Treatment End Date: | 7/24/2012 | | Treatment Summary: | PUMPED 278460# OTTAWA SAND and 22277# Super LC DOWNHOLE in 165522gals of Clearstar/GELLED/SLICK/RECYCLED WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| | Total fluid used in treatment (bbls): | 3941 | Max pressure during treatment (psi): | 3722 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 321 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3620 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 300737 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7907 ft. | # Of Holes: | 104 | | Interval Bottom: | 7951 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 5/24/2013 Interval Top: 7460 ft. Interval Bottom: 7476 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/21/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/24/2012 | Treatment End Date: | 7/29/2012 | | Treatment Summary: | PUMPED 127164# OTTAWA SAND DOWNHOLE in 137970gals of Clearstar/GELLED/SLICK/RECYCLED WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| | Total fluid used in treatment (bbls): | 3285 | Max pressure during treatment (psi): | 4930 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | 138 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3147 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 127164 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7460 ft. | # Of Holes: | 64 | | Interval Bottom: | 7476 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 8/27/2012 Interval Top: 7276 ft. Interval Bottom: 7951 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/21/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/27/2012 | Treatment End Date: | N/A | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/27/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 109 | | BBLS_OIL | 162 | | BTU_GAS | 1244 | | CALC_BBLS_H2O | 109 | | CALC_BBLS_OIL | 162 | | CALC_GOR | 3414 | | CALC_MCF_GAS | 553 | | CASING_PRESS | 341 | | GRAVITY_OIL | 51 | | MCF_GAS | 553 |
| | Perforation Data: | | Interval Top: | 7276 ft. | # Of Holes: | 216 | | Interval Bottom: | 7951 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 6/1/2019 Interval Top: 7276 ft. Interval Bottom: 7476 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/21/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/24/2013 | Treatment End Date: | N/A | | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7276 ft. | # Of Holes: | 112 | | Interval Bottom: | 7476 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 5/24/2013 Interval Top: 7276 ft. Interval Bottom: 7360 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/21/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/24/2012 | Treatment End Date: | 8/9/2012 | | Treatment Summary: | PUMPED 244954# OTTAWA SAND DOWNHOLE in 202712gals of Vistar/GELLED/SLICK/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| | Total fluid used in treatment (bbls): | 4826 | Max pressure during treatment (psi): | 4611 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 264 | Total flowback volume recovered (bbls): | 949 | | Fresh water used in treatment (bbls): | 4562 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 244954 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7276 ft. | # Of Holes: | 48 | | Interval Bottom: | 7360 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2020 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|