Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35557
Well Classification: OW Status: SI - 7/1/2020
Well Name/No:Thomsen USX #X07-29D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2020
FacilityID:428872LocationID:428867
County:WELD #123Location:SWSW 6 2N65W 6
Field:WATTENBERG - #90750Elevation:4978 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1073FSL  826 FWLLat/Long: 40.163170 / -104.712890Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.163180 / -104.712900Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2012
End Date: 8/6/2012
Reported: 8/24/2012
Days to report: 18
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2020             Measured TD: 8145 ft.    Vertical TD: 8004 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/9/2014
Proposed Top PZ Location:Sec:6 Twp: 2N 65W Footage: 75 FSL  1350 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65W Footage: 75 FSL  1350 FWL
Proposed Depth/Form:8105 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 960 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 328, Top: 0 ft., Bottom: 960 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8105 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 705, Top: , Bottom: 8105 ft.

Wellbore Completed
Completion Date:7/5/2012
Spud Date:6/30/2012Spud Date Is:ACTUAL
Measured TD:8145 ft.Measured PB depth:8090 ft.
True Vertical TD:8004 ft.True Vertical PB depth:7949 ft.
Top PZ Location:Sec:6 Twp: 2N 65WFootage: 80 FSL  1321 FWL
Bottom Hole Location:Sec:6 Twp: 2N 65WFootage: 78 FSL  1323 FWL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1045 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 383, Top: 13 ft., Bottom: 1045 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.875 in., Size: 4.5 in., Top: 2010 ft., Depth: 8135 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 2750 ft., Bottom: 8135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE689 ft.
PARKMAN4179 ft.
SUSSEX4732 ft.
SHANNON5515 ft.
NIOBRARA7215 ft.
CODELL7516 ft.
J SAND7982 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 10/1/2017                 Interval Top: 7985 ft.    Interval Bottom: 7993 ft.

 Completed Information for Formation J SAND
1st Production Date:8/22/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2012Treatment End Date:8/6/2012
Treatment Summary:PUMPED 251869# Ottawa sand and 16792# SB Excel in 161671gals of Clearstar, Gelled Water, Fresh Water downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3849Max pressure during treatment (psi):4161
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):431
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):268661Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7985 ft.# Of Holes:32
Interval Bottom:7993 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7517 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation CODELL
1st Production Date:8/22/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2012Treatment End Date:8/6/2012
Treatment Summary:PUMPED 242763# Ottawa sand in 127800gals of Clearstar, Gelled Water, Slick Water, 15% HCL downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3043Max pressure during treatment (psi):4957
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):13Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):431
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):242763Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7517 ft.# Of Holes:64
Interval Bottom:7533 ft.Hole Size:0.4 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/22/2012                 Interval Top: 7286 ft.    Interval Bottom: 7993 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/22/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/22/2012Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 109
BTU_GAS 1248
CALC_BBLS_H2O 20
CALC_BBLS_OIL 109
CALC_GOR 2532
CALC_MCF_GAS 276
CASING_PRESS 605
GRAVITY_OIL 49
MCF_GAS 276
Perforation Data:
Interval Top:7286 ft.# Of Holes:120
Interval Bottom:7993 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 7/1/2020                  Interval Top: 7286 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/22/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/8/2013Treatment End Date:N/A
Treatment Summary:CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7286 ft.# Of Holes:88
Interval Bottom:7533 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/8/2013                  Interval Top: 7286 ft.    Interval Bottom: 7392 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/22/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2012Treatment End Date:8/1/2012
Treatment Summary:PUMPED 249233# Ottawa sand in 165701gals of Clearstar, Gelled Water, Slick Water, Fresh Water downhole. CODELL AND J SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
Total fluid used in treatment (bbls):3945Max pressure during treatment (psi):5535
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):431
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):249233Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7286 ft.# Of Holes:24
Interval Bottom:7392 ft.Hole Size:2 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2020
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No