Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35457
Well Classification: OW Status: PR - 1/14/2013
Well Name/No:PALYO #13N-11HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/14/2013
FacilityID:428634LocationID:428629
County:WELD #123Location:NWNW 11 2N65W 6
Field:WATTENBERG - #90750Elevation:4856 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:692FNL  611 FWLLat/Long: 40.158587 / -104.638273Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.158587 / -104.638280Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/11/2012
End Date: 12/11/2012
Reported: 1/18/2013
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/6/2013             Measured TD: 11479 ft.    Vertical TD: 6898 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/6/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/19/2014
Proposed Top PZ Location:Sec:11 Twp: 2N 65 Footage: 644 FNL  196 FWL
Bottom Hole Location:Sec:11 Twp: 2N 65 Footage: 485 FSL  217 FWL
Proposed Depth/Form:11474 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: 11:W2W2, 10:E2E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7260 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 690, Top: , Bottom: 7260 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6228 ft., Depth: 11474 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/31/2012
Spud Date:7/30/2012Spud Date Is:ACTUAL
Measured TD:11479 ft.Measured PB depth:11456 ft.
True Vertical TD:6898 ft.True Vertical PB depth:6898 ft.
Top PZ Location:Sec:11 Twp: 2N 65Footage: 644 FNL  196 FWL
Bottom Hole Location:Sec:11 Twp: 2N 65Footage: 485 FSL  217 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: SGR-TVD, SGR-MD; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 890 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 890 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7299 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 140 ft., Bottom: 7299 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6363 ft., Depth: 11465 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7027 ft.
NIOBRARA7155 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2013                  Interval Top: 7363 ft.    Interval Bottom: 11464 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/5/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2012Treatment End Date:12/11/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7363-11464. 1611640# 40/70 SAND, 330220# 30/50 SAND, 24002# SUPER LC, 1965862# TOTAL PROPPANT. 9918 BBL LIGHTNING 24, 376 BBL LINEAR GEL, 68439 BBL SLICKKWATER, 78733 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):78733Max pressure during treatment (psi):7861
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6289
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1965862Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6867 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/14/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 294
BTU_GAS 1278
CALC_BBLS_OIL 294
CALC_GOR 1867
CALC_MCF_GAS 549
CASING_PRESS 1500
GRAVITY_OIL 46
MCF_GAS 549
TUBING_PRESS 1444
Perforation Data:
Interval Top:7363 ft.# Of Holes:0
Interval Bottom:11464 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3713
Total Gas Produced (MCF)63471
GOR17094
GOR DeterminationMCFE
Average BOE per Day40.141
Average MCFE per Day232.802

 Federal Financial Assurance  i 

 Tribal Well  i No