Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35366
Well Classification: OW Status: SI - 1/1/2026
Well Name/No:DAVIS #1C-9H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:428455LocationID:428454
County:WELD #123Location:SWNE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4915 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2326FNL  1622 FELLat/Long: 40.153440 / -104.778590Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.153535 / -104.778571Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/21/2012
End Date: 7/21/2012
Reported: 10/1/2012
Days to report: 72
Disclosure: Sidetrack #00
Start Date: 10/21/2018
End Date: 10/22/2018
Reported: 6/13/2019
Originally Reported: 3/20/2019
Days to report: 234
Days to report: 149
Disclosure: Sidetrack #00
Start Date: 10/21/2018
End Date: 10/22/2018
Reported: 3/20/2019
Days to report: 149
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 14495 ft.    Vertical TD: 7186 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/4/2014
Proposed Top PZ Location:Sec:9 Twp: 2N 66W Footage: 1982 FNL  2461 FEL
Bottom Hole Location:Sec:4 Twp: 2N 66W Footage: 615 FNL  2446 FEL
Proposed Depth/Form:14464 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7589 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 928, Top: 500 ft., Bottom: 7589 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14482 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: 1ST LINER, Hole Size: 3.92 in., Size: 3.74 in., Top: 7320 ft., Depth: 13750 ft., Weight: 8.8 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/6/2012
Spud Date:4/10/2012Spud Date Is:ACTUAL
Measured TD:14495 ft.Measured PB depth:14316 ft.
True Vertical TD:7186 ft.True Vertical PB depth:7156 ft.
Top PZ Location:Sec:9 Twp: 2N 66WFootage: 1982 FNL  2461 FEL
Bottom Hole Location:Sec:4 Twp: 2N 66WFootage: 615 FNL  2446 FEL
Log Types:Isolation Scanner Cement Evaluation Log/ GeoLogPlot
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 972 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 985 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7637 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2900 ft., Bottom: 7655 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14482 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 5782 ft., Bottom: 14495 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4410 ft.
NIOBRARA7160 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 1/1/2026                  Interval Top: 7654 ft.    Interval Bottom: 14315 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/14/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/21/2018Treatment End Date:10/22/2018
Treatment Summary:No additional stages perf'ed. Treated with 62,828 bbl fresh water, 76 bbl HCl, 61 bbl additives (FRP-4CS, ACI-97 and ASF-67) with 1,594,285 proppant.
Total fluid used in treatment (bbls):62965Max pressure during treatment (psi):9127
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):76Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):617
Fresh water used in treatment (bbls):62889Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1594285Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2012Treatment End Date:8/21/2012
Treatment Summary:FRAC STAGE 1. with 1,392 bbls Hybrid fluid system placing 500 lbs proppant. Frac stage 2. Pumped 1531 bbls. slick water and 445 bbls. X-link gel with 17,376# 40/70 sand, sand, total 17,376#). Set frac plug #1 @ 13,984'. Frac stage 3. Pumped 1,487 bbls. slick water and 2,761bbls. X-link gel with 18,215# 40/70 sand, 221,14# 30/50 sand, and 24,224# 20/40 sand,total 263,586#).Set CFP 2 at 13,749’. Frac stage 4. Pumped 1,472 bbls. slick water and 2,746 bbls. X-link gel with 17,501# 40/70 sand, 222,047# 30/50 sand, and 12,873# 20/40 sand, total 252,420#).5# 40/70 sand. Set frac plug #3 @ 13,749'.Set CFP 4 at 13,517’. Frac stage 5. Pumped 1,455 bbls. slick water and 2,750 bbls. X-link gel with 18,515# 40/70 sand, 222,230# 30/50 sand, and 20,104# 20/40 sand, total 260849#). Set CFP 5 at 13,285’. Frac stage 6. Pumped 1,432 bbls. slick water and 2,720 bbls. X-link gel with 18,070# 40/70 sand, 219,000# 30/50 sand, and 12,841# 20/40 sand, total 249,910#. Set CFP 6 at 13,052’. Frac stage 7. Pumped 1,420 bbls. slick water and 2,732 bbls. X-link gel with 17,861# 40/70 sand, 220,188# 30/50 sand, and 12,840# 20/40 sand, total 250,889#. Set CFP 7 at 12,821’. Frac stage 8. Pumped 1,386 bbls. slick water and 2,749 bbls. X-link gel with 17,296# 40/70 sand, 221,159# 30/50 sand, and 12,840# 20/40 sand, total 251,295#. Frac stage 9. Pumped 1,495 bbls. slick water and 2,706 bbls. X-link gel with 17,387# 40/70 sand, 219,703# 30/50 sand, and 12,840# 20/40 sand, total 249,930#. Set CFP 8 at 12,821’. Set CFP 9 at 12,357’. Frac stage 10. Pumped 1,402 bbls. slick water and 2,742 bbls. X-link gel with 17,771# 40/70 sand, 223,866# 30/50 sand, and 12,846# 20/40 sand, total 254,482#. Set CFP 10 at 12,124’. Frac stage 11. Pumped 1,404 bbls. slick water and 2,690 bbls. X-link gel with 17,742# 40/70 sand, 219,878# 30/50 sand, and 12,847# 20/40 sand, total 250,467#. Set CFP 11 at 11,888’. Frac stage 12. Pumped 1,392 bbls. slick water and 2,745 bbls. X-link gel with 17,426# 40/70 sand, 222563# 30/50 sand, and 12,850# 20/40 sand, total 252838#. Set CFP 12 at 11,654’. Frac stage 13. Pumped 1,382 bbls. slick water and 2,700 bbls. X-link gel with 17,737# 40/70 sand, 219,287# 30/50 sand, and 12,879# 20/40 sand, total 249,903#. Set CFP 13 at 11,418’. Frac stage 14. Pumped 1,376 bbls. slick water and 2,730 bbls. X-link gel with 17,472# 40/70 sand, 221,313# 30/50 sand, and 12,909# 20/40 sand, total 251,694#. Set CFP 14 at 11,183’. Frac stage 15. Pumped 1,372 bbls. slick water and 2,752 bbls. X-link gel with 17,480# 40/70 sand, 222,587# 30/50 sand, and 12,838# 20/40 sand, total 252,904#. Set CFP 15 at 10,946’. Frac stage 16. Pumped 1,360 bbls. slick water and 2,733 bbls. X-link gel with 17,273# 40/70 sand, 221,618# 30/50 sand, and 12,840# 20/40 sand, total 251,7314#. Set CFP 16 at 10,701’. Frac stage 17. Pumped 1367 bbls. slick water and 2,734 bbls. X-link gel with 17,492# 40/70 sand, 222003# 30/50 sand, and 12,888# 20/40 sand, total 252383#. Set CFP 17 at 10,451’. Frac stage 18. Pumped 1149 bbls. slick water and 2,756 bbls. X-link gel with 17,310# 40/70 sand, 221,654# 30/50 sand, and 12,794# 20/40 sand, total 251,758#. Set frac plug #18 @ 10,201', Frac stage 19. Pumped 1348 bbls. slick water and 2,709 bbls. X-link gel with 17,292# 40/70 sand, 219,923# 30/50 sand, and 12840# 20/40 sand, total 250055#. Set CFP 19 at 9,921’. Frac stage 20. Pumped 1,353 bbls. slick water and 2,700 bbls. X-link gel with 17,302# 40/70 sand, 220,143# 30/50 sand, and 12,840# 20/40 sand, total 250,285#. Set CFP 20 at 9,713’. Frac stage 21. Pumped 1,337 bbls. slick water and 2,721 bbls. X-link gel with 17,334# 40/70 sand, 218,511# 30/50 sand, and 12,804# 20/40 sand, total 248,649#. Set CFP 21 at 9,65’. Frac stage 22. Pumped 1341 bbls. slick water and 2716 bbls. X-link gel with 17,384# 40/70 sand, 220153# 30/50 sand, and 12,840# 20/40 sand, total 250378#. Set CFP 22 at 9,215’. Frac stage 23. Pumped 1,334 bbls. slick water and 2,710 bbls. X-link gel with 17,343# 40/70 sand, 220,364# 30/50 sand, and 12,840# 20/40 sand, total 250547#. Set CFP 23 at 8,966’. Frac stage 24. Pumped 1,789 bbls. slick water and 0 bbls. X-link gel with 6,612# 40/70 sand, total 6,612#. Set CFP 24 at 8,716’. Frac stage 25. Pumped 776 bbls. slick water and 259 bbls. linear gel with 4,526# 40/70 sand. Set frac plug #25 @ 8,466', Frac stage 26. Pumped 1,932 bbls. slick water and 3,260 bbls. X-link gel with 27,071# 40/70 sand, 263,744# 30/50 sand, and 15,393# 20/40 sand, total 306,209#. Set frac plug #26 @ 8,179', Frac stage 27. Pumped 1,551 bbls. slick water and 3,479 bbls. X-link gel with 20,754# 40/70 sand, 256,669# 30/50 sand, and 20,136# 20/40 sand, total 297,559#. Set frac plug #27 @ 7,886', Frac stage 28. Pumped 1,051 bbls. slick water and 3,329 bbls. X-link gel with 22,969# 40/70 sand, 264,045# 30/50 sand, and 22,580# 20/40 sand, total 309,594#. Set CBP @ 6420'. Drilled kill plug and drill plugs.
Total fluid used in treatment (bbls):115269Max pressure during treatment (psi):8460
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):115269Total flowback volume recovered (bbls):8627
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/4/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 256
BBLS_OIL 396
BTU_GAS 1319
CALC_BBLS_H2O 256
CALC_BBLS_OIL 396
CALC_GOR 3194
CALC_MCF_GAS 1265
CASING_PRESS 1950
GRAVITY_OIL 49
MCF_GAS 1265
TUBING_PRESS 1150
Perforation Data:
Interval Top:7654 ft.# Of Holes:1440
Interval Bottom:14315 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1052
Total Gas Produced (MCF)21789
GOR20711
GOR DeterminationMCFE
Average BOE per Day13.120
Average MCFE per Day76.090

 Federal Financial Assurance  i 

 Tribal Well  i No