Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35356
Well Classification: OW Status: PR - 6/1/2018
Well Name/No:WEICHEL #1N-11HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2018
FacilityID:428438LocationID:305715
County:WELD #123Location:SESE 14 2N65W 6
Field:WATTENBERG - #90750Elevation:4879 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:466FSL  418 FELLat/Long: 40.132536 / -104.623099Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.132532 / -104.623100Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/18/2012
End Date: 11/18/2012
Reported: 1/9/2013
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2018             Measured TD: 16006 ft.    Vertical TD: 6880 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/1/2014
Proposed Top PZ Location:Sec:14 Twp: 2N 65W Footage: 1424 FSL  711 FEL
Bottom Hole Location:Sec:11 Twp: 2N 65W Footage: 488 FNL  866 FEL
Proposed Depth/Form:16377 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: 11:E2E2; 14:E2E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7256 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 7256 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6255 ft., Depth: 16377 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/6/2012
Spud Date:7/14/2012Spud Date Is:ACTUAL
Measured TD:16006 ft.Measured PB depth:15976 ft.
True Vertical TD:6880 ft.True Vertical PB depth:6882 ft.
Top PZ Location:Sec:14 Twp: 2N 65WFootage: 1424 FSL  711 FEL
Bottom Hole Location:Sec:11 Twp: 2N 65WFootage: 488 FNL  866 FEL
Log Types:PRE FORM 5
Log Types:CBL; MWD: NFE-GR; NFE-MPR-GR; MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 940 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 940 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7292 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 225 ft., Bottom: 7292 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6310 ft., Depth: 15986 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6849 ft.
NIOBRARA6938 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2018                  Interval Top: 7599 ft.    Interval Bottom: 13978 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/7/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/16/2012Treatment End Date:11/18/2012
Treatment Summary:FRACED THROUGH AN OPEN HOLE LINER FROM 7599-13978. 2062180# 40/70, 1602080# 30/50, 12980 SUPER LC, 3785240# TOTAL SAND. 30289 BBL X-LINKED GEL, 616 BBL FR WATER, 75354 BBL LINEAR GEL, 106259 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):106259Max pressure during treatment (psi):7439
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):28846
Fresh water used in treatment (bbls):616Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3785240Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6828 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/15/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 88
BTU_GAS 1277
CALC_BBLS_OIL 88
CALC_GOR 1455
CALC_MCF_GAS 128
CASING_PRESS 865
GRAVITY_OIL 50
MCF_GAS 128
TUBING_PRESS 1501
Perforation Data:
Interval Top:7599 ft.# Of Holes:0
Interval Bottom:13978 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1790
Total Gas Produced (MCF)19742
GOR11029
GOR DeterminationBOE
Average BOE per Day14.244
Average MCFE per Day82.628

 Federal Financial Assurance  i 

 Tribal Well  i No