|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/7/2020 Measured TD: 7170 ft. Vertical TD: 7059 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/7/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/29/2014 | | Proposed Top PZ Location: | Sec:27 Twp: 4N 64W | Footage: 1287 FSL 75 FWL | | Bottom Hole Location: | Sec:27 Twp: 4N 64W | Footage: 1287 FSL 75 FWL | | Proposed Depth/Form: | 7120 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 407, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7120 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 567, Top: , Bottom: 7120 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/25/2012 | | Spud Date: | 4/21/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7170 ft. | Measured PB depth: | 7111 ft. | | True Vertical TD: | 7059 ft. | True Vertical PB depth: | 7000 ft. | | Top PZ Location: | Sec:27 Twp: 4N 64W | Footage: 1287 FSL 75 FWL | | Bottom Hole Location: | Sec:27 Twp: 4N 64W | Footage: 1287 FSL 75 FWL | | Log Types: | CBL
Triple Combo
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 822 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 313, Top: 0 ft., Bottom: 822 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7156 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 1308 ft., Bottom: 7156 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2794 ft. | | | | | PARKMAN | 3736 ft. | | | | | SUSSEX | 4274 ft. | | | | | SHANNON | 4863 ft. | | | | | TEEPEE BUTTES | 6041 ft. | | | | | SHARON SPRINGS | 6658 ft. | | | | | NIOBRARA | 6687 ft. | | | | | FORT HAYS | 6953 ft. | | | | | CODELL | 6977 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 9/4/2012 Interval Top: 6975 ft. Interval Bottom: 6988 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/31/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/2012 | | Treatment Summary: | Pumped 134,589 lbs of Ottawa Proppant and 199,374 gallons of Slick Water.
The Codell is producing through a composite flow through plug |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6975 ft. | # Of Holes: | 52 | | Interval Bottom: | 6988 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/29/2020 Interval Top: 6708 ft. Interval Bottom: 6988 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/31/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 35 | | BBLS_OIL | 35 | | BTU_GAS | 1284 | | CALC_BBLS_H2O | 35 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 2771 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 910 | | GRAVITY_OIL | 51 | | MCF_GAS | 97 |
| | Perforation Data: | | Interval Top: | 6708 ft. | # Of Holes: | 100 | | Interval Bottom: | 6988 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/4/2012 Interval Top: 6708 ft. Interval Bottom: 6788 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/31/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/30/2012 | | Treatment Summary: | Pumped 140,158,lbs of Ottawa Proppant and 201,222 gallons of Slick |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6708 ft. | # Of Holes: | 48 | | Interval Bottom: | 6788 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/29/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|