Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35351
Well Classification: OW Status: PA - 10/29/2020
Well Name/No:Herbst #C27-33D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/29/2020
FacilityID:428402LocationID:328011
County:WELD #123Location:NWSW 27 4N64W 6
Field:WATTENBERG - #90750Elevation:4704 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2027FSL  664 FWLLat/Long: 40.281780 / -104.544100Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.281790 / -104.544110Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/30/2012
End Date: 5/30/2012
Reported: 9/16/2013
Originally Reported: 8/19/2013
Days to report: 474
Days to report: 446
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/7/2020             Measured TD: 7170 ft.    Vertical TD: 7059 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/7/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/29/2014
Proposed Top PZ Location:Sec:27 Twp: 4N 64W Footage: 1287 FSL  75 FWL
Bottom Hole Location:Sec:27 Twp: 4N 64W Footage: 1287 FSL  75 FWL
Proposed Depth/Form:7120 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 407, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7120 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 567, Top: , Bottom: 7120 ft.

Wellbore Completed
Completion Date:4/25/2012
Spud Date:4/21/2012Spud Date Is:ACTUAL
Measured TD:7170 ft.Measured PB depth:7111 ft.
True Vertical TD:7059 ft.True Vertical PB depth:7000 ft.
Top PZ Location:Sec:27 Twp: 4N 64WFootage: 1287 FSL  75 FWL
Bottom Hole Location:Sec:27 Twp: 4N 64WFootage: 1287 FSL  75 FWL
Log Types:CBL Triple Combo
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 822 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 313, Top: 0 ft., Bottom: 822 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7156 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 1308 ft., Bottom: 7156 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE2794 ft.
PARKMAN3736 ft.
SUSSEX4274 ft.
SHANNON4863 ft.
TEEPEE BUTTES6041 ft.
SHARON SPRINGS6658 ft.
NIOBRARA6687 ft.
FORT HAYS6953 ft.
CODELL6977 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/4/2012                  Interval Top: 6975 ft.    Interval Bottom: 6988 ft.

 Completed Information for Formation CODELL
1st Production Date:5/31/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/30/2012
Treatment Summary:Pumped 134,589 lbs of Ottawa Proppant and 199,374 gallons of Slick Water. The Codell is producing through a composite flow through plug
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6975 ft.# Of Holes:52
Interval Bottom:6988 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/29/2020                Interval Top: 6708 ft.    Interval Bottom: 6988 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/31/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 35
BBLS_OIL 35
BTU_GAS 1284
CALC_BBLS_H2O 35
CALC_BBLS_OIL 35
CALC_GOR 2771
CALC_MCF_GAS 97
CASING_PRESS 910
GRAVITY_OIL 51
MCF_GAS 97
Perforation Data:
Interval Top:6708 ft.# Of Holes:100
Interval Bottom:6988 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/4/2012                  Interval Top: 6708 ft.    Interval Bottom: 6788 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/31/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/30/2012
Treatment Summary:Pumped 140,158,lbs of Ottawa Proppant and 201,222 gallons of Slick
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6708 ft.# Of Holes:48
Interval Bottom:6788 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/29/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No