|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/10/2020 Measured TD: 7440 ft. Vertical TD: 7058 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/10/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/26/2014 | | Proposed Top PZ Location: | Sec:28 Twp: 4N 64W | Footage: 1425 FNL 75 FEL | | Bottom Hole Location: | Sec:28 Twp: 4N 64W | Footage: 1425 FNL 75 FEL | | Proposed Depth/Form: | 7404 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 407, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7404 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 597, Top: , Bottom: 7404 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/4/2012 | | Spud Date: | 4/30/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7440 ft. | Measured PB depth: | 7376 ft. | | True Vertical TD: | 7058 ft. | True Vertical PB depth: | 6987 ft. | | Top PZ Location: | Sec:28 Twp: 4N 64W | Footage: 1435 FNL 55 FEL | | Bottom Hole Location: | Sec:28 Twp: 4N 64W | Footage: 1445 FNL 61 FEL | | Log Types: | Caliper/Comp. Density/Neutron/GR/SP/ML
DIL/GR/SP/Caliper
CBL/CCL/GR
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 279, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 7427 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 1961 ft., Bottom: 7427 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2798 ft. | | | | | PARKMAN | 3739 ft. | | | | | SUSSEX | 4463 ft. | | | | | SHANNON | 5123 ft. | | | | | NIOBRARA | 6995 ft. | | | | | FORT HAYS | 7258 ft. | | | | | CODELL | 7283 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/23/2012 Interval Top: 7284 ft. Interval Bottom: 7300 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/4/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/2/2012 | Treatment End Date: | 6/2/2012 | | Treatment Summary: | Pumped 128524.5# of Ottawa Sand and 211251gals of 15% HCL, Slick/Fresh Water
Niobrara and Codell formations are commingled. | | Total fluid used in treatment (bbls): | 5030 | Max pressure during treatment (psi): | 5868 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 128525 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7266 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7284 ft. | # Of Holes: | 64 | | Interval Bottom: | 7300 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/17/2020 Interval Top: 7079 ft. Interval Bottom: 7300 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7266 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/7/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 90 | | BBLS_OIL | 100 | | BTU_GAS | 1227 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 5350 | | CALC_MCF_GAS | 535 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 53 | | MCF_GAS | 535 |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 112 | | Interval Bottom: | 7300 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/23/2012 Interval Top: 7079 ft. Interval Bottom: 7175 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/4/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/2/2012 | Treatment End Date: | 6/2/2012 | | Treatment Summary: | Pumped 128524.5# of Ottawa Sand and 208854gals of 15% HCL, Slick/Fresh Water
Niobrara and Codell formations are commingled. | | Total fluid used in treatment (bbls): | 4973 | Max pressure during treatment (psi): | 5471 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 128525 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7266 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 48 | | Interval Bottom: | 7175 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/17/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|