|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/4/2019 Measured TD: 7792 ft. Vertical TD: 7659 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/4/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/24/2014 | Proposed Top PZ Location: | Sec:17 Twp: 3N 64W | Footage: 1402 FSL 2560 FWL | Bottom Hole Location: | Sec:17 Twp: 3N 64W | Footage: 1393 FSL 2567 FWL | Proposed Depth/Form: | 7728 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 407, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7728 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 659, Top: , Bottom: 7728 ft. |
| | |
Wellbore Completed | Completion Date: | 5/30/2012 | Spud Date: | 5/29/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7792 ft. | Measured PB depth: | 7743 ft. | True Vertical TD: | 7659 ft. | True Vertical PB depth: | 7610 ft. | Top PZ Location: | Sec:17 Twp: 3N 64W | Footage: 1402 FSL 2560 FWL | Bottom Hole Location: | Sec:17 Twp: 3N 64W | Footage: 1393 FSL 2567 FWL | Log Types: | CBL
TRIPLE COMBO | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 14 ft., Depth: 873 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 307, Top: 0 ft., Bottom: 873 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 14 ft., Depth: 7788 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: 1226 ft., Bottom: 7788 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1008 ft. | | | | PARKMAN | 3829 ft. | | | | SUSSEX | 4194 ft. | | | | SHANNON | 4983 ft. | | | | NIOBRARA | 6853 ft. | | | | CODELL | 7100 ft. | | | | J SAND | 7567 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 2/4/2019 Interval Top: 7590 ft. Interval Bottom: 7622 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | THE PLUG ABOVE JSAND WAS REMOVED 2/5/2013. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/16/2012 | Treatment Summary: | PUMPED 304166# OTTAWA SAND and 13617#SB Excel DOWNHOLE in 163043gals of SilverStim/GELLED/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| Total fluid used in treatment (bbls): | 3882 | Max pressure during treatment (psi): | 3728 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 10 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.65 | Recycled water used in treatment (bbls): | 343 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 3539 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 317783 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7590 ft. | # Of Holes: | 104 | Interval Bottom: | 7622 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/23/2018 Interval Top: 7102 ft. Interval Bottom: 7126 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | THE PLUG ABOVE JSAND WAS REMOVED 2/5/2013. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/16/2012 | Treatment Summary: | PUMPED 251006# OTTAWA SAND DOWNHOLE in 125076gals of 15%HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| Total fluid used in treatment (bbls): | 2978 | Max pressure during treatment (psi): | 4044 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 7 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | 260 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 2706 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 251006 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7102 ft. | # Of Holes: | 96 | Interval Bottom: | 7126 ft. | Hole Size: | 0.44 in. |
|
Formation JNBCD Formation Classification: OW Status: AB - 2/4/2019 Interval Top: 6878 ft. Interval Bottom: 7622 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 11/21/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 12/5/2012 | Treatment End Date: | N/A | Treatment Summary: | CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/5/2012 | Test Method: | FLOWING | Hours Tested: | 15 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 15 | BBLS_OIL | 97 | BTU_GAS | 1167 | CALC_BBLS_H2O | 15 | CALC_BBLS_OIL | 97 | CALC_GOR | 5237 | CALC_MCF_GAS | 508 | CASING_PRESS | 633 | GRAVITY_OIL | 51 | MCF_GAS | 508 |
| Perforation Data: | Interval Top: | 6878 ft. | # Of Holes: | 248 | Interval Bottom: | 7622 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/4/2019 Interval Top: 6878 ft. Interval Bottom: 7126 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | THE PLUG ABOVE JSAND WAS REMOVED 2/5/2013. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | | Treatment Date: | 12/9/2014 | Treatment End Date: | N/A | Treatment Summary: |
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 6878 ft. | # Of Holes: | 144 | Interval Bottom: | 7126 ft. | Hole Size: | 0.44 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/23/2018 Interval Top: 6878 ft. Interval Bottom: 6988 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | THE PLUG ABOVE JSAND WAS REMOVED 2/5/2013. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/16/2012 | Treatment Summary: | PUMPED 277656# OTTAWA SAND DOWNHOLE in 166952gals of 15% HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER
CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS
FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
| Total fluid used in treatment (bbls): | 3975 | Max pressure during treatment (psi): | 4698 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 7 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.97 | Recycled water used in treatment (bbls): | 300 | Total flowback volume recovered (bbls): | 1139 | Fresh water used in treatment (bbls): | 3675 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 277656 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6878 ft. | # Of Holes: | 48 | Interval Bottom: | 6988 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
Reported Plugged | Y | 02/04/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|