Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35319
Well Classification: OW Status: PA - 6/26/2019
Well Name/No:LDS #D17-25D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/26/2019
FacilityID:428315LocationID:428321
County:WELD #123Location:NESW 17 3N64W 6
Field:WATTENBERG - #90750Elevation:4752 ft.
Planned Location:2411FSL  2465 FWLLat/Long: 40.224710 / -104.575580Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.224720 / -104.575590Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/27/2012
End Date: 7/27/2012
Reported: 8/3/2012
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/4/2019             Measured TD: 7855 ft.    Vertical TD: 7605 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/4/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/24/2014
Proposed Top PZ Location:Sec:17 Twp: 3N 64W Footage: 1646 FSL  1313 FWL
Bottom Hole Location:Sec:17 Twp: 3N 64W Footage: 1643 FSL  1319 FWL
Proposed Depth/Form:7750 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 407, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7750 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 670, Top: , Bottom: 7750 ft.

Wellbore Completed
Completion Date:6/6/2012
Spud Date:6/3/2012Spud Date Is:ACTUAL
Measured TD:7855 ft.Measured PB depth:7770 ft.
True Vertical TD:7605 ft.True Vertical PB depth:7560 ft.
Top PZ Location:Sec:17 Twp: 3N 64WFootage: 1646 FSL  1313 FWL
Bottom Hole Location:Sec:17 Twp: 3N 64WFootage: 1643 FSL  1319 FWL
Log Types:CBL TRIPLE COMBO
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 876 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 364, Top: 0 ft., Bottom: 876 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7846 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 1738 ft., Bottom: 7846 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1008 ft.
PARKMAN3864 ft.
SUSSEX4240 ft.
SHANNON5061 ft.
NIOBRARA6934 ft.
FORT HAYS7177 ft.
CODELL7202 ft.
J SAND7667 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/26/2019                 Interval Top: 7670 ft.    Interval Bottom: 7708 ft.

 Completed Information for Formation J SAND
1st Production Date:11/21/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/27/2012Treatment End Date:7/27/2012
Treatment Summary:PUMPED 194922# OTTAWA SAND and 14781#SB Excel DOWNHOLE in 139566gals of SilverStim/GELLED//RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):3323Max pressure during treatment (psi):3669
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):243Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3080Disposition method For flowback:RECYCLE
Total proppant used (lbs):209703Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7670 ft.# Of Holes:136
Interval Bottom:7708 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/9/2014                 Interval Top: 7203 ft.    Interval Bottom: 7217 ft.

 Completed Information for Formation CODELL
1st Production Date:11/21/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/27/2012Treatment End Date:7/27/2012
Treatment Summary:PUMPED 268250# OTTAWA SAND DOWNHOLE in 127512gals of 15% HCL/SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):3036Max pressure during treatment (psi):4219
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):282Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2742Disposition method For flowback:RECYCLE
Total proppant used (lbs):268250Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7203 ft.# Of Holes:56
Interval Bottom:7217 ft.Hole Size:0.4 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 11/25/2012                Interval Top: 6982 ft.    Interval Bottom: 7708 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:11/20/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:11/25/2012Treatment End Date:N/A
Treatment Summary:CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 23
BTU_GAS 1149
CALC_BBLS_H2O 6
CALC_BBLS_OIL 23
CALC_GOR 3826
CALC_MCF_GAS 88
CASING_PRESS 911
GRAVITY_OIL 52
MCF_GAS 88
Perforation Data:
Interval Top:6982 ft.# Of Holes:240
Interval Bottom:7708 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/26/2019                 Interval Top: 6982 ft.    Interval Bottom: 7217 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/21/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:12/9/2014Treatment End Date:N/A
Treatment Summary:CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6982 ft.# Of Holes:104
Interval Bottom:7217 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/9/2014                 Interval Top: 6982 ft.    Interval Bottom: 7090 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/21/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/27/2012Treatment End Date:7/27/2012
Treatment Summary:PUMPED 260825# OTTAWA SAND DOWNHOLE in 163884gals of SilverStim/GELLED/SLICK/RECYCLED/FRESH WATER CODELL AND J-SAND ARE PRODUCING THROUGH COMPOSITE FLOW-THROUGH PLUGS FLOWBACK VOLUMES REPORTED ON NIOBRARA COMPLETION PANEL
Total fluid used in treatment (bbls):3902Max pressure during treatment (psi):4596
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):292Total flowback volume recovered (bbls):1149
Fresh water used in treatment (bbls):3610Disposition method For flowback:RECYCLE
Total proppant used (lbs):260825Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6982 ft.# Of Holes:48
Interval Bottom:7090 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/26/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No