Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35294
Well Classification: OW Status: PR - 5/7/2015
Well Name/No:North Platte #J-F-34HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/7/2015
FacilityID:428265LocationID:428272
County:WELD #123Location:SWSW 34 5N63W 6
Field:WATTENBERG - #90750Elevation:4529 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:570FSL  300 FWLLat/Long: 40.350282 / -104.430329Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.350281 / -104.430325Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/13/2015
End Date: 3/17/2015
Reported: 4/14/2015
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/7/2015             Measured TD: 11262 ft.    Vertical TD: 6516 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/7/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/20/2016
Proposed Top PZ Location:Sec:34 Twp: 5N 63W Footage: 631 FSL  1358 FWL
Bottom Hole Location:Sec:34 Twp: 5N 63W Footage: 470 FNL  1358 FWL
Proposed Depth/Form:11237 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7015 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 7015 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6915 ft., Depth: 11237 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/14/2015
Spud Date:12/30/2014Spud Date Is:ACTUAL
Measured TD:11262 ft.Measured PB depth:11207 ft.
True Vertical TD:6516 ft.True Vertical PB depth:6514 ft.
Top PZ Location:Sec:34 Twp: 5N 63WFootage: 695 FSL  1375 FWL
Bottom Hole Location:Sec:34 Twp: 5N 63WFootage: 480 FNL  1356 FWL
Log Types:Mud, CBL, MWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 439 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 439 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7093 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 795, Top: 184 ft., Bottom: 7093 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6869 ft., Depth: 11254 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6360 ft.NN
NIOBRARA6494 ft.NN
FORT HAYS6901 ft.
CODELL7090 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/3/2017                 Interval Top: 10966 ft.    Interval Bottom: 11262 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:10/3/2017Treatment End Date:N/A
Treatment Summary:10966-11020, 11116-11262
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10966 ft.# Of Holes:250
Interval Bottom:11262 ft.Hole Size:1.36 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 5/7/2015                  Interval Top: 7160 ft.    Interval Bottom: 11262 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/30/2015Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/13/2015Treatment End Date:3/17/2015
Treatment Summary:25 Stage Codel pumped a total of 60,967 bbls of fluid (Phazer) and 3,604,570 # of sand (40/70 Ottawa, 20/40 Ottawa); ATP 4,505 psi, ATR 46.00 bpm, Final ISDP 3,722 psi; completed with sliding sleeves and casing packers.
Total fluid used in treatment (bbls):60967Max pressure during treatment (psi):6308
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15066
Fresh water used in treatment (bbls):60967Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3604570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6822 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 181
BBLS_OIL 376
BTU_GAS 1280
CALC_BBLS_H2O 181
CALC_BBLS_OIL 376
CALC_GOR 1058
CALC_MCF_GAS 398
CASING_PRESS 1013
GRAVITY_OIL 45
MCF_GAS 398
TUBING_PRESS 510
Perforation Data:
Interval Top:7160 ft.# Of Holes:250
Interval Bottom:11262 ft.Hole Size:1.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/3/2017                 Interval Top: 7160 ft.    Interval Bottom: 11115 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:10/3/2017Treatment End Date:N/A
Treatment Summary:7160-10965, 11021-11115
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7160 ft.# Of Holes:250
Interval Bottom:11115 ft.Hole Size:1.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)971
Total Gas Produced (MCF)1911
GOR1968
GOR DeterminationBOE
Average BOE per Day3.551
Average MCFE per Day20.587

 Federal Financial Assurance  i 

 Tribal Well  i No