Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35258
Well Classification: OW Status: PR - 9/1/2018
Well Name/No:CAMP #25N-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2018
FacilityID:428157LocationID:428152
County:WELD #123Location:SWSE 31 3N65W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  1357 FELLat/Long: 40.175944 / -104.701706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175943 / -104.701710Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/10/2012
End Date: 9/10/2012
Reported: 10/15/2012
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2018             Measured TD: 14144 ft.    Vertical TD: 7156 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2014
Proposed Top PZ Location:Sec:31 Twp: 3N 65W Footage: 862 FSL  2309 FEL
Bottom Hole Location:Sec:30 Twp: 3N 65W Footage: 2076 FSL  2549 FEL
Proposed Depth/Form:13807 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: See Comments
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7556 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 7556 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6576 ft., Depth: 13807 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/2/2012
Spud Date:4/7/2012Spud Date Is:ACTUAL
Measured TD:14144 ft.Measured PB depth:14127 ft.
True Vertical TD:7156 ft.True Vertical PB depth:7156 ft.
Top PZ Location:Sec:31 Twp: 3N 65WFootage: 862 FSL  2309 FEL
Bottom Hole Location:Sec:30 Twp: 3N 65WFootage: 2076 FSL  2549 FEL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; LWD: GRR, SGRR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 853 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 25 ft., Bottom: 853 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7556 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 570 ft., Bottom: 7556 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6453 ft., Depth: 14129 ft., Weight: 11.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7233 ft.
NIOBRARA7373 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2018                  Interval Top: 7594 ft.    Interval Bottom: 14060 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/21/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2012Treatment End Date:9/10/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7594-14060. 919900# 40/70 2607060# 30/50, 240200# SUPER LC, 3767160# TOTAL. 108975 BBL X-LINKED GEL, 8349 BBL FR WATER, 38408 BBL LINEAR GEL, 760 BBL ACID, 156491 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):156491Max pressure during treatment (psi):7537
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2738
Fresh water used in treatment (bbls):8349Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3767160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6573 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 299
BTU_GAS 1238
CALC_BBLS_OIL 299
CALC_GOR 2873
CALC_MCF_GAS 859
CASING_PRESS 2301
GRAVITY_OIL 51
MCF_GAS 859
TUBING_PRESS 1635
Perforation Data:
Interval Top:7594 ft.# Of Holes:0
Interval Bottom:14060 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4917
Total Gas Produced (MCF)26013
GOR5290
GOR DeterminationBOE
Average BOE per Day25.578
Average MCFE per Day148.363

 Federal Financial Assurance  i 

 Tribal Well  i No