Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35256
Well Classification: OW Status: PR - 10/1/2025
Well Name/No:CAMP #24N-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:428155LocationID:428152
County:WELD #123Location:SESE 31 3N65W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  1319 FELLat/Long: 40.175944 / -104.701572Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175942 / -104.701576Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/17/2012
End Date: 9/17/2012
Reported: 10/17/2012
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2025             Measured TD: 13978 ft.    Vertical TD: 7125 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2014
Proposed Top PZ Location:Sec:31 Twp: 3N 65W Footage: 1023 FSL  1172 FEL
Bottom Hole Location:Sec:30 Twp: 3N 65W Footage: 2124 FSL  1161 FEL
Proposed Depth/Form:13750 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: 31: E/2; 30: SE/4
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7460 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 700, Top: , Bottom: 7460 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6473 ft., Depth: 13750 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/2/2012
Spud Date:4/5/2012Spud Date Is:ACTUAL
Measured TD:13978 ft.Measured PB depth:13977 ft.
True Vertical TD:7125 ft.True Vertical PB depth:7124 ft.
Top PZ Location:Sec:31 Twp: 3N 65WFootage: 1023 FSL  1172 FEL
Bottom Hole Location:Sec:30 Twp: 3N 65WFootage: 2124 FSL  1161 FEL
Log Types:PRE 5
Log Types:CBL; LPLOT VH; SGR-MD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 840 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 25 ft., Bottom: 840 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7530 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 779, Top: 320 ft., Bottom: 7530 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6559 ft., Depth: 13978 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7066 ft.
NIOBRARA7218 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2025                 Interval Top: 7599 ft.    Interval Bottom: 13978 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/6/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/15/2012Treatment End Date:9/17/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7599-13978. 1640160# 40/70, 3306440# 30/50, 239920# SUPER LC, 5186520# TOTAL SAND WEIGHT 50208 BBL X-LINKED GEL, 65503 BBL FR WATER, 3806 BBL LINEAR GEL, 119518 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):119518Max pressure during treatment (psi):6679
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13955
Fresh water used in treatment (bbls):65503Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5186520Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7046 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/21/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 246
BTU_GAS 1238
CALC_BBLS_OIL 246
CALC_GOR 2992
CALC_MCF_GAS 736
CASING_PRESS 2555
GRAVITY_OIL 51
MCF_GAS 736
TUBING_PRESS 2054
Perforation Data:
Interval Top:7599 ft.# Of Holes:0
Interval Bottom:13978 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)538
Total Gas Produced (MCF)3095
GOR5752
GOR DeterminationBOE
Average BOE per Day2.939
Average MCFE per Day17.054

 Federal Financial Assurance  i 

 Tribal Well  i No