|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2022 Measured TD: 8530 ft. Vertical TD: 8350 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/27/2014 | | Proposed Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 1980 FSL 660 FWL | | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 1980 FSL 660 FWL | | Proposed Depth/Form: | 8440 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 805, Top: 0 ft., Bottom: 1150 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8440 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8440 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/11/2012 | | Spud Date: | 11/7/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8530 ft. | Measured PB depth: | 8205 ft. | | True Vertical TD: | 8350 ft. | True Vertical PB depth: | 8026 ft. | | Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 1979 FSL 651 FWL | | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 1991 FSL 648 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1171 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 0 ft., Bottom: 1171 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8530 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 51, Top: 8211 ft., Bottom: 8530 ft., Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 965 ft., Depth: 8211 ft., Bottom: 8211 ft., Sacks: 1047, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 830 ft., Depth: 8211 ft., Bottom: 8211 ft., Sacks: 1047, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3976 ft. | | | | | SUSSEX | 4932 ft. | | | | | NIOBRARA | 7485 ft. | | | | | CODELL | 7905 ft. | | | | | J SAND | 8335 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/1/2013 Interval Top: 7926 ft. Interval Bottom: 7944 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/26/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/17/2013 | Treatment End Date: | 6/17/2013 | | Treatment Summary: | 4698 BBL SLICKWATER, 4698 BBL TOTAL FLUID.
150960# 40/70 SAND, 4000# 20/40 SAND, 154960# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4698 | Max pressure during treatment (psi): | 3996 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 430 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154960 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7926 ft. | # Of Holes: | 54 | | Interval Bottom: | 7944 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2022 Interval Top: 7520 ft. Interval Bottom: 7944 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/26/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 29 | | BTU_GAS | 1198 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 1276 | | CALC_MCF_GAS | 37 | | CASING_PRESS | 914 | | GRAVITY_OIL | 52 | | MCF_GAS | 37 |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 120 | | Interval Bottom: | 7944 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/1/2013 Interval Top: 7520 ft. Interval Bottom: 7782 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/26/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/17/2013 | Treatment End Date: | 6/17/2013 | | Treatment Summary: | 5901 BBL SLICKWATER, 6 BBL ACID, 5907 BBL TOTAL FLUID.
200460# 40/70 SAND, 4000# 20/40 SAND, 204460# TOTAL SAND. | | Total fluid used in treatment (bbls): | 4907 | Max pressure during treatment (psi): | 4271 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 430 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204460 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 66 | | Interval Bottom: | 7782 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 07/31/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|