Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35197
Well Classification: OW Status: SI - 8/1/2022
Well Name/No:XCEL #12-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2022
FacilityID:428006LocationID:428011
County:WELD #123Location:SWSW 27 1N67W 6
Field:WATTENBERG - #90750Elevation:5025 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:561FSL  644 FWLLat/Long: 40.016369 / -104.883750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.016374 / -104.883756Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/17/2013
End Date: 6/17/2013
Reported: 8/2/2013
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2022             Measured TD: 8530 ft.    Vertical TD: 8350 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/27/2014
Proposed Top PZ Location:Sec:27 Twp: 1N 67W Footage: 1980 FSL  660 FWL
Bottom Hole Location:Sec:27 Twp: 1N 67W Footage: 1980 FSL  660 FWL
Proposed Depth/Form:8440 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24.0 , Citings Type: PLANNED
Cement:Sacks: 805, Top: 0 ft., Bottom: 1150 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8440 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8440 ft.

Wellbore Completed
Completion Date:11/11/2012
Spud Date:11/7/2012Spud Date Is:ACTUAL
Measured TD:8530 ft.Measured PB depth:8205 ft.
True Vertical TD:8350 ft.True Vertical PB depth:8026 ft.
Top PZ Location:Sec:27 Twp: 1N 67WFootage: 1979 FSL  651 FWL
Bottom Hole Location:Sec:27 Twp: 1N 67WFootage: 1991 FSL  648 FWL
Log Types:PRE FORM 5
Log Types:CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1171 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 0 ft., Bottom: 1171 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8530 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 51, Top: 8211 ft., Bottom: 8530 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 965 ft., Depth: 8211 ft., Bottom: 8211 ft., Sacks: 1047, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 830 ft., Depth: 8211 ft., Bottom: 8211 ft., Sacks: 1047, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3976 ft.
SUSSEX4932 ft.
NIOBRARA7485 ft.
CODELL7905 ft.
J SAND8335 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/1/2013                 Interval Top: 7926 ft.    Interval Bottom: 7944 ft.

 Completed Information for Formation CODELL
1st Production Date:6/26/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/17/2013Treatment End Date:6/17/2013
Treatment Summary:4698 BBL SLICKWATER, 4698 BBL TOTAL FLUID. 150960# 40/70 SAND, 4000# 20/40 SAND, 154960# TOTAL SAND.
Total fluid used in treatment (bbls):4698Max pressure during treatment (psi):3996
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):430
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):154960Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7926 ft.# Of Holes:54
Interval Bottom:7944 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 8/1/2022                  Interval Top: 7520 ft.    Interval Bottom: 7944 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/26/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/10/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 29
BTU_GAS 1198
CALC_BBLS_OIL 29
CALC_GOR 1276
CALC_MCF_GAS 37
CASING_PRESS 914
GRAVITY_OIL 52
MCF_GAS 37
Perforation Data:
Interval Top:7520 ft.# Of Holes:120
Interval Bottom:7944 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/1/2013                 Interval Top: 7520 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/26/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/17/2013Treatment End Date:6/17/2013
Treatment Summary:5901 BBL SLICKWATER, 6 BBL ACID, 5907 BBL TOTAL FLUID. 200460# 40/70 SAND, 4000# 20/40 SAND, 204460# TOTAL SAND.
Total fluid used in treatment (bbls):4907Max pressure during treatment (psi):4271
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):430
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):204460Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7520 ft.# Of Holes:66
Interval Bottom:7782 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
07/31/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No