|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2022 Measured TD: 7922 ft. Vertical TD: 7918 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/27/2014 | Proposed Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 510 FSL 510 FWL | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 510 FSL 510 FWL | Proposed Depth/Form: | 7928 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 24.0 , Citings Type: PLANNED | Cement: | Sacks: 805, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7928 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 7928 ft. |
| | |
Wellbore Completed | Completion Date: | 11/7/2012 | Spud Date: | 11/3/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7922 ft. | Measured PB depth: | 7888 ft. | True Vertical TD: | 7918 ft. | True Vertical PB depth: | 7884 ft. | Top PZ Location: | Sec:27 Twp: 1N 67W | Footage: 541 FSL 528 FWL | Bottom Hole Location: | Sec:27 Twp: 1N 67W | Footage: 543 FSL 550 FWL | Log Types: | PRE FORM 5 | Log Types: | CEMENT BOND LOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1178 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 0 ft., Bottom: 1178 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7922 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 960, Top: 810 ft., Bottom: 7922 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4416 ft. | | | | SUSSEX | 4783 ft. | 5020 ft. | | | NIOBRARA | 7359 ft. | | | | FORT HAYS | 7738 ft. | | | | CODELL | 7761 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/1/2013 Interval Top: 7764 ft. Interval Bottom: 7788 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/26/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/17/2013 | Treatment End Date: | 6/17/2013 | Treatment Summary: | 4705 BBL SLICKWATER, 4705 BBL TOTAL FLUID.
148880# 40/70 SAND, 4000# 20/40 SAND, 152880# TOTAL SAND. | Total fluid used in treatment (bbls): | 4705 | Max pressure during treatment (psi): | 4072 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.79 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 344 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 152880 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7764 ft. | # Of Holes: | 72 | Interval Bottom: | 7788 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2022 Interval Top: 7368 ft. Interval Bottom: 7788 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/26/2013 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/10/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 29 | BTU_GAS | 1198 | CALC_BBLS_OIL | 29 | CALC_GOR | 483 | CALC_MCF_GAS | 14 | CASING_PRESS | 309 | GRAVITY_OIL | 52 | MCF_GAS | 14 |
| Perforation Data: | Interval Top: | 7368 ft. | # Of Holes: | 132 | Interval Bottom: | 7788 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/1/2013 Interval Top: 7368 ft. Interval Bottom: 7630 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/26/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/17/2013 | Treatment End Date: | 6/17/2013 | Treatment Summary: | 5963 BBL SLICKWATER, 6 BBL ACID, 5969 BBL TOTAL FLUID.
200320# 40/70 SAND, 4000# 20/40 SAND, 204320# TOTAL SAND. | Total fluid used in treatment (bbls): | 5969 | Max pressure during treatment (psi): | 4481 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 344 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 204320 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7368 ft. | # Of Holes: | 60 | Interval Bottom: | 7630 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 07/31/2022 |
Low Producing | Y | Production Period 07/2024 - 06/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|