Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35184
Well Classification: OW Status: PR - 4/1/2019
Well Name/No:NORTON #35N-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2019
FacilityID:427989LocationID:427984
County:WELD #123Location:NWNW 29 3N66W 6
Field:WATTENBERG - #90750Elevation:4897 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:370FNL  1307 FWLLat/Long: 40.202007 / -104.805955Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202010 / -104.805960Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/18/2013
End Date: 2/18/2013
Reported: 4/11/2013
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2019             Measured TD: 11667 ft.    Vertical TD: 7174 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2014
Proposed Top PZ Location:Sec:29 Twp: 3N 66W Footage: 734 FNL  1414 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66W Footage: 487 FSL  1400 FWL
Proposed Depth/Form:11694 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7481 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 7481 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6448 ft., Depth: 11694 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/11/2012
Spud Date:8/10/2012Spud Date Is:ACTUAL
Measured TD:11667 ft.Measured PB depth:11650 ft.
True Vertical TD:7174 ft.True Vertical PB depth:7172 ft.
Top PZ Location:Sec:29 Twp: 3N 66WFootage: 734 FNL  1414 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66WFootage: 487 FSL  1400 FWL
Log Types:PRE FORM 5
Log Types:CBL; (2) NFE-GR; MPR-GR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 945 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 945 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7575 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 758, Top: 750 ft., Bottom: 7575 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6502 ft., Depth: 11652 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7153 ft.
NIOBRARA7290 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2019                  Interval Top: 7638 ft.    Interval Bottom: 11667 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/22/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/14/2013Treatment End Date:2/18/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7638-11667. 9649 BBL CROSSLINK GEL, 797 BBL LINEAR GEL, 64449 BBL SLICKWATER, 74895 BBL TOTAL FLUID. 1618589# OTTAWA 40/70 SAND, 303994# OTTAWA 30/50 SAND, 25852# CRC 20/40 SAND, 1948435# TOTAL SAND.
Total fluid used in treatment (bbls):74895Max pressure during treatment (psi):7546
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5434
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1948435Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7086 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/9/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 452
BTU_GAS 1219
CALC_BBLS_OIL 452
CALC_GOR 2546
CALC_MCF_GAS 1151
CASING_PRESS 2546
GRAVITY_OIL 48
MCF_GAS 1151
TUBING_PRESS 1755
Perforation Data:
Interval Top:7638 ft.# Of Holes:0
Interval Bottom:11667 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1398
Total Gas Produced (MCF)24001
GOR17168
GOR DeterminationMCFE
Average BOE per Day15.211
Average MCFE per Day88.224

 Federal Financial Assurance  i 

 Tribal Well  i No