Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35183
Well Classification: OW Status: PR - 5/1/2021
Well Name/No:NORTON #34N-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:427988LocationID:427984
County:WELD #123Location:NWNW 29 3N66W 6
Field:WATTENBERG - #90750Elevation:4896 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:250FNL  1307 FWLLat/Long: 40.202337 / -104.805962Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202345 / -104.805967Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/11/2013
End Date: 2/11/2013
Reported: 4/11/2013
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2021             Measured TD: 11776 ft.    Vertical TD: 7190 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2014
Proposed Top PZ Location:Sec:29 Twp: 3N 66W Footage: 700 FNL  295 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66W Footage: 488 FSL  142 FWL
Proposed Depth/Form:11854 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: 29: W2W2; 30: E2E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7631 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7631 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6596 ft., Depth: 11854 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/15/2012
Spud Date:8/14/2012Spud Date Is:ACTUAL
Measured TD:11776 ft.Measured PB depth:11752 ft.
True Vertical TD:7190 ft.True Vertical PB depth:7190 ft.
Top PZ Location:Sec:29 Twp: 3N 66WFootage: 700 FNL  295 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66WFootage: 488 FSL  142 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: GR; MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7619 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 684, Top: 952 ft., Bottom: 7619 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.5 in., Size: 4.5 in., Top: 6650 ft., Depth: 11751 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7238 ft.
NIOBRARA7414 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2021                  Interval Top: 7664 ft.    Interval Bottom: 11776 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/10/2013Treatment End Date:2/11/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7664-11776. 32783 BBL CROSSLINK GEL, 864 BBL LINEAR GEL, 38815 BBL SLICKWATER, 72462 BBL TOTAL FLUID. 1064719# 40/70 SAND, 2265683# 30/50 SAND, 195020# 20/40 SAND, 3525421# TOTAL SAND.
Total fluid used in treatment (bbls):72462Max pressure during treatment (psi):7180
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):4373
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3525421Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/27/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 229
BBLS_OIL 523
BTU_GAS 1219
CALC_BBLS_H2O 229
CALC_BBLS_OIL 523
CALC_GOR 857
CALC_MCF_GAS 448
CASING_PRESS 2067
GRAVITY_OIL 50
MCF_GAS 448
TUBING_PRESS 1730
Perforation Data:
Interval Top:7664 ft.# Of Holes:0
Interval Bottom:11776 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5923
Total Gas Produced (MCF)47105
GOR7952
GOR DeterminationBOE
Average BOE per Day38.499
Average MCFE per Day223.300

 Federal Financial Assurance  i 

 Tribal Well  i No