Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35180
Well Classification: OW Status: PR - 4/1/2019
Well Name/No:NORTON #14N-29HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2019
FacilityID:427982LocationID:427984
County:WELD #123Location:NWNW 29 3N66W 6
Field:WATTENBERG - #90750Elevation:4896 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:280FNL  1307 FWLLat/Long: 40.202254 / -104.805960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.202260 / -104.805963Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/19/2013
End Date: 2/19/2013
Reported: 4/15/2013
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2019             Measured TD: 11719 ft.    Vertical TD: 7191 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/27/2014
Proposed Top PZ Location:Sec:29 Twp: 3N 66W Footage: 662 FNL  2080 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66W Footage: 486 FSL  1983 FWL
Proposed Depth/Form:11716 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: E/2W/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 900 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 900 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7512 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 710, Top: , Bottom: 7512 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6492 ft., Depth: 11716 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/3/2012
Spud Date:8/13/2012Spud Date Is:ACTUAL
Measured TD:11719 ft.Measured PB depth:11652 ft.
True Vertical TD:7191 ft.True Vertical PB depth:7187 ft.
Top PZ Location:Sec:29 Twp: 3N 66WFootage: 662 FNL  2080 FWL
Bottom Hole Location:Sec:29 Twp: 3N 66WFootage: 486 FSL  1983 FWL
Log Types:PRE FORM 5
Log Types:CBL; MWD: NFE-GR; (4) MUD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 927 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 0 ft., Bottom: 927 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7553 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 721, Top: 423 ft., Bottom: 7553 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6599 ft., Depth: 11700 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7184 ft.
NIOBRARA7319 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2019                  Interval Top: 7582 ft.    Interval Bottom: 11632 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/22/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/14/2013Treatment End Date:2/18/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7582-11632. 81468 BBL SLICKWATER, 81468 BBL TOTAL FLUID. 1768747# 40/70 SAND, 1768747# TOTAL SAND.
Total fluid used in treatment (bbls):81468Max pressure during treatment (psi):7614
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):6062
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1768747Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7163 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2013Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 51
BBLS_OIL 290
BTU_GAS 1219
CALC_BBLS_H2O 51
CALC_BBLS_OIL 290
CALC_GOR 3210
CALC_MCF_GAS 931
CASING_PRESS 1681
GRAVITY_OIL 50
MCF_GAS 931
TUBING_PRESS 1164
Perforation Data:
Interval Top:7582 ft.# Of Holes:0
Interval Bottom:11632 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3327
Total Gas Produced (MCF)31282
GOR9402
GOR DeterminationBOE
Average BOE per Day23.966
Average MCFE per Day138.988

 Federal Financial Assurance  i 

 Tribal Well  i No