Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35171
Well Classification: OW Status: PR - 5/1/2024
Well Name/No:Raindance FC #26-249HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2024
FacilityID:427924LocationID:427917
Municipality/County:WINDSOR / WELD #123Location:NENE 30 6N67W 6
Field:WATTENBERG - #90750Elevation:4784 ft.
Planned Location:881FNL  316 FELLat/Long: 40.462566 / -104.927595Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/16/2022
End Date: 2/18/2022
Reported: 3/17/2022
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2024             Measured TD: 20543 ft.    Vertical TD: 6831 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/17/2024
Proposed Top PZ Location:Sec:30 Twp: 6N 67W Footage: 1907 FSL  460 FEL
Bottom Hole Location:Sec:26 Twp: 6N 68W Footage: 1907 FSL  2179 FEL
Proposed Depth/Form:19983 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1900 , Unit Acreage: 771, Drill Unit: T6N R67W: Sec 30:S2;
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 844, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19983 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2757, Top: 3367 ft., Bottom: 19983 ft.

Wellbore Completed
Completion Date:10/20/2021
Spud Date:7/4/2021Spud Date Is:ACTUAL
Measured TD:20543 ft.Measured PB depth:20390 ft.
True Vertical TD:6831 ft.True Vertical PB depth:6840 ft.
Top PZ Location:Sec:30 Twp: 6N 67WFootage: 1879 FSL  549 FEL
Bottom Hole Location:Sec:26 Twp: 6N 68WFootage: 1913 S  2304 E
Log Types:CBL, Mud Log, MWD/LWD, (Composite in 123-44988)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2062 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 2062 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20395 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2275, Top: 3108 ft., Bottom: 20395 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 20395 ft., Depth: 20543 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3440 ft.3764 ft.NN
SUSSEX3996 ft.4243 ft.NN
SHANNON4616 ft.4742 ft.NN
SHARON SPRINGS7489 ft.NN
NIOBRARA7629 ft.NN
FORT HAYS8304 ft.NN
CODELL8440 ft.NN
CARLILE20397 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/14/2023                 Interval Top: 15040 ft.    Interval Bottom: 20160 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/14/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 15,040'-15,173', 15,252' – 15,832', 15,902' – 15,970', 18,403' – 18,492', 18,578' – 18,592', 18,667' – 19,062', 19,330' – 19,502', 19,773' - 20,160'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:15040 ft.# Of Holes:1298
Interval Bottom:20160 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/14/2023                 Interval Top: 14655 ft.    Interval Bottom: 19773 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/14/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 14,655'-15,040', 15,173'-15,252', 15,832' -15,902', 19,062'- 19,330', 19,502' -19,773'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:14655 ft.# Of Holes:1298
Interval Bottom:19773 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/14/2023                 Interval Top: 8520 ft.    Interval Bottom: 20167 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/14/2023Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,520'-14,665', 15,970' - 18,403', 18,492' -18,578', 18,592' - 18,667', 20,160' -20,167'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8520 ft.# Of Holes:1298
Interval Bottom:20167 ft.Hole Size:0.34 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/1/2024                  Interval Top: 8520 ft.    Interval Bottom: 20167 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:5/3/2022Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/16/2022Treatment End Date:2/18/2022
Treatment Summary:2,024 bbls 15% HCl Acid; 693,995# 100 Mesh Sand; 10,847,578# 20/40 Sand; 248,188 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):250212Max pressure during treatment (psi):4463
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:58
Total acid used in treatment (bbls):2024Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15456
Fresh water used in treatment (bbls):248188Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11541573Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7991 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/4/2022Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 202
BBLS_OIL 135
BTU_GAS 1391
CALC_BBLS_H2O 202
CALC_BBLS_OIL 135
CALC_GOR 1242
CALC_MCF_GAS 168
CASING_PRESS 71
GRAVITY_OIL 42
MCF_GAS 168
TUBING_PRESS 892
Perforation Data:
Interval Top:8520 ft.# Of Holes:1298
Interval Bottom:20167 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)31830
Total Gas Produced (MCF)170921
GOR5369
GOR DeterminationBOE
Average BOE per Day166.993
Average MCFE per Day968.561

 Federal Financial Assurance  i 

 Tribal Well  i No