Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35166
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:BROWN #1N-35HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:427901LocationID:310115
County:WELD #123Location:SESE 35 3N66W 6
Field:WATTENBERG - #90750Elevation:5052 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:473FSL  548 FELLat/Long: 40.175915 / -104.736958Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175916 / -104.736890Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/11/2012
End Date: 7/11/2012
Reported: 9/10/2012
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2019             Measured TD: 11708 ft.    Vertical TD: 7309 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/24/2014
Proposed Top PZ Location:Sec:35 Twp: 3N 66W Footage: 636 FSL  660 FEL
Bottom Hole Location:Sec:26 Twp: 3N 66W Footage: 460 FSL  660 FEL
Proposed Depth/Form:12692 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2E2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 810 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 810 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7626 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 760, Top: , Bottom: 7626 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6579 ft., Depth: 12692 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/15/2012
Spud Date:3/14/2012Spud Date Is:ACTUAL
Measured TD:11708 ft.Measured PB depth:11683 ft.
True Vertical TD:7309 ft.True Vertical PB depth:7273 ft.
Top PZ Location:Sec:35 Twp: 3N 66WFootage: 816 FSL  738 FEL
Bottom Hole Location:Sec:35 Twp: 3N 66WFootage: 492 FNL  758 FEL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; PCGK-PCDC-ADR; PCDC-PCG-K; PCGK-PCSC-ADR; MD-LOG; MD-LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 855 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 25 ft., Bottom: 855 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7774 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 736, Top: 920 ft., Bottom: 7774 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6644 ft., Depth: 11693 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN3366 ft.
SUSSEX4559 ft.
SHARON SPRINGS7333 ft.
NIOBRARA7511 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2019                  Interval Top: 7825 ft.    Interval Bottom: 11623 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/31/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2012Treatment End Date:7/11/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7825-11623. AVERAGE TREATING PRESSURE 5173, AVERAGE RATE 59. 972860# 40/70; 2138340# 30/50, 141600# SB EXCEL, TOTAL SAND WEIGHT 3252800#.
Total fluid used in treatment (bbls):65943Max pressure during treatment (psi):7407
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):34321Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3252800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7206 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 213
BTU_GAS 1279
CALC_BBLS_OIL 213
CALC_GOR 2992
CALC_MCF_GAS 637
CASING_PRESS 2629
GRAVITY_OIL 52
MCF_GAS 637
TUBING_PRESS 1844
Perforation Data:
Interval Top:7825 ft.# Of Holes:0
Interval Bottom:11623 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)542
Total Gas Produced (MCF)11350
GOR20940
GOR DeterminationMCFE
Average BOE per Day6.823
Average MCFE per Day39.586

 Federal Financial Assurance  i 

 Tribal Well  i No