Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35160
Well Classification: OW Status: PR - 6/1/2019
Well Name/No:BROWN #13C-26HZX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:427893LocationID:336245
County:WELD #123Location:SWSW 35 3N66W 6
Field:WATTENBERG - #90750Elevation:5020 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:639FSL  467 FWLLat/Long: 40.176226 / -104.752098Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176232 / -104.752101Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/24/2012
End Date: 7/24/2012
Reported: 9/5/2012
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 6/25/2012             Measured TD: 8075 ft.    Vertical TD: 7508 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 6/25/2012
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/24/2014
Proposed Top PZ Location:Sec:35 Twp: 3N 66W Footage: 725 FSL  556 FWL
Bottom Hole Location:Sec:35 Twp: 3N 66W Footage: 982 FSL  600 FWL
Proposed Depth/Form:12944 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: 35:W2W2; 26:SW4SW4
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 770 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 770 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7835 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 790, Top: , Bottom: 7835 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6770 ft., Depth: 12944 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/11/2012
Spud Date:3/27/2012Spud Date Is:ACTUAL
Measured TD:8075 ft.Measured PB depth:7695 ft.
True Vertical TD:7508 ft.True Vertical PB depth:7444 ft.
Bottom Hole Location:Sec:35 Twp: 3N 66WFootage: 982 FSL  600 FWL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 574, Top: 0 ft., Bottom: 806 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.875 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 739, Top: 1004 ft., Bottom: 7797 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 7797 ft., Depth: 8075 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 7695 ft., Depth: 8075 ft., Bottom: 8075 ft., Sacks: 74, Method:
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 6/1/2019             Measured TD: 12848 ft.    Vertical TD: 7465 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 6/1/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/29/2014
Proposed Top PZ Location:Sec:35 Twp: 3N 66W Footage: 737 FSL  561 FWL
Bottom Hole Location:Sec:26 Twp: 3N 66W Footage: 452 FSL  551 FWL
Proposed Depth/Form:12848 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 574, Top: 22 ft., Bottom: 806 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 739, Top: 7695 ft., Bottom: 7797 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6884 ft., Depth: 12834 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/21/2012
Spud Date:3/26/2012Spud Date Is:ACTUAL
Measured TD:12848 ft.Measured PB depth:12824 ft.
True Vertical TD:7465 ft.True Vertical PB depth:7465 ft.
Top PZ Location:Sec:35 Twp: 3N 66WFootage: 737 FSL  561 FWL
Bottom Hole Location:Sec:26 Twp: 3N 66WFootage: 452 FSL  551 FWL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; MD LOG; ADR-PCG-CTN-ALD-PCD; MD-LOG; CTN-ALD-ADR-PCG-PDC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 806 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 574, Top: 0 ft., Bottom: 806 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7797 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 739, Top: 1004 ft., Bottom: 7797 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6884 ft., Depth: 12834 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7305 ft.
NIOBRARA7422 ft.
CODELL7753 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 6/1/2019                  Interval Top: 7888 ft.    Interval Bottom: 12765 ft.

 Completed Information for Formation CODELL
1st Production Date:8/2/2012Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/23/2012Treatment End Date:7/24/2012
Treatment Summary:TREATED THROUGH AN OPEN HOLE LINER FROM 7888-12765. AVERAGE TREATING PRESSURE 5185, AVERAGE RATE 55.5. 1300020# 40/70, 2661550# 30/50, 203520# CRC-20/40, TOTAL SAND WEIGHT 4165090#
Total fluid used in treatment (bbls):90747Max pressure during treatment (psi):7752
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8440
Fresh water used in treatment (bbls):39399Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4165090Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7396 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/13/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 322
BTU_GAS 1279
CALC_BBLS_OIL 322
CALC_GOR 1703
CALC_MCF_GAS 548
CASING_PRESS 2468
GRAVITY_OIL 56
MCF_GAS 548
TUBING_PRESS 1405
Perforation Data:
Interval Top:7888 ft.# Of Holes:0
Interval Bottom:12765 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3431
Total Gas Produced (MCF)40502
GOR11804
GOR DeterminationBOE
Average BOE per Day28.452
Average MCFE per Day165.030

 Federal Financial Assurance  i 

 Tribal Well  i No