Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35148
Well Classification: GW Status: PR - 12/1/2025
Well Name/No:BROWN #37C-26HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:427880LocationID:310115
County:WELD #123Location:SESE 35 3N66W 6
Field:WATTENBERG - #90750Elevation:5053 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:463FSL  562 FELLat/Long: 40.175888 / -104.737007Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175890 / -104.737075Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/13/2012
End Date: 7/13/2012
Reported: 9/10/2012
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2025             Measured TD: 12658 ft.    Vertical TD: 7487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/24/2014
Proposed Top PZ Location:Sec:35 Twp: 3N 66W Footage: 634 FSL  1115 FEL
Bottom Hole Location:Sec:26 Twp: 3N 66W Footage: 460 FSL  1115 FEL
Proposed Depth/Form:12945 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: 35:E/2; 26:S/2SE/4
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 810 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 810 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7879 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 790, Top: , Bottom: 7879 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6835 ft., Depth: 12945 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/5/2012
Spud Date:3/15/2012Spud Date Is:ACTUAL
Measured TD:12658 ft.Measured PB depth:12655 ft.
True Vertical TD:7487 ft.True Vertical PB depth:7487 ft.
Top PZ Location:Sec:35 Twp: 3N 66WFootage: 845 FSL  921 FEL
Bottom Hole Location:Sec:26 Twp: 3N 66WFootage: 290 FSL  1014 FEL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; CS-NGR; CTN-ALD-EWR-DGR-PCD; MD LOG
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 828 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 828 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7953 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 751, Top: 1110 ft., Bottom: 7953 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6780 ft., Depth: 12655 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7275 ft.
NIOBRARA7391 ft.
FORT HAYS7854 ft.
CODELL8002 ft.

Formation CODL                     Formation Classification:  GW                     Status:  PR - 12/1/2025                 Interval Top: 8002 ft.    Interval Bottom: 12574 ft.

 Completed Information for Formation CODELL
1st Production Date:7/31/2012Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/12/2012Treatment End Date:7/13/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 8002-12574. AVERAGE TREATING PRESSURE 5386, AVERAGE RATE 59. 1255740# 40/70, 2286690# 30/50, 150800# SB EXCEL, TOTAL SAND WEIGHT 3693230#
Total fluid used in treatment (bbls):73617Max pressure during treatment (psi):7796
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):37853Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3693230Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7276 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 219
BTU_GAS 1279
CALC_BBLS_OIL 219
CALC_GOR 3151
CALC_MCF_GAS 689
CASING_PRESS 2677
GRAVITY_OIL 52
MCF_GAS 689
TUBING_PRESS 1960
Perforation Data:
Interval Top:8002 ft.# Of Holes:0
Interval Bottom:12574 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)486
Total Gas Produced (MCF)9755
GOR20072
GOR DeterminationMCFE
Average BOE per Day5.211
Average MCFE per Day30.217

 Federal Financial Assurance  i 

 Tribal Well  i No