Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35147
Well Classification: OW Status: PR - 8/1/2018
Well Name/No:CAMP #4N-31HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2018
FacilityID:427879LocationID:427876
County:WELD #123Location:SWSW 31 3N65W 6
Field:WATTENBERG - #90750Elevation:4971 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FSL  1320 FWLLat/Long: 40.175961 / -104.711114Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.175958 / -104.711118Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/30/2012
End Date: 8/30/2012
Reported: 10/15/2012
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2018             Measured TD: 11441 ft.    Vertical TD: 7154 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/24/2014
Proposed Top PZ Location:Sec:31 Twp: 3N 65W Footage: 773 FSL  777 FWL
Bottom Hole Location:Sec:31 Twp: 3N 65W Footage: 463 FNL  797 FWL
Proposed Depth/Form:11722 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: W/2W/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 820 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 820 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7536 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 750, Top: , Bottom: 7536 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6487 ft., Depth: 11722 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/1/2012
Spud Date:4/1/2012Spud Date Is:ACTUAL
Measured TD:11441 ft.Measured PB depth:11434 ft.
True Vertical TD:7154 ft.True Vertical PB depth:7147 ft.
Top PZ Location:Sec:31 Twp: 3N 65WFootage: 773 FSL  777 FWL
Bottom Hole Location:Sec:31 Twp: 3N 65WFootage: 463 FNL  797 FWL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; MUD; MWD (NFE-GR-MPR)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 848 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 16 ft., Bottom: 848 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7414 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 1300 ft., Bottom: 7414 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6536 ft., Depth: 11436 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6919 ft.
NIOBRARA6991 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2018                  Interval Top: 7441 ft.    Interval Bottom: 11312 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/14/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/26/2012Treatment End Date:8/30/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7441-11312. AVERAGE TREATING PRESSURE 6017, AVERAGE RATE 54. 1052480# 40/70, 2255780# 30/50, 161620# SB EXCEL, TOTAL SAND WEIGHT 3469880#.
Total fluid used in treatment (bbls):77314Max pressure during treatment (psi):7370
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8900
Fresh water used in treatment (bbls):43051Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3469880Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7093 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 324
BTU_GAS 1220
CALC_BBLS_OIL 324
CALC_GOR 3043
CALC_MCF_GAS 985
CASING_PRESS 2606
GRAVITY_OIL 50
MCF_GAS 985
TUBING_PRESS 1779
Perforation Data:
Interval Top:7441 ft.# Of Holes:0
Interval Bottom:11312 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4334
Total Gas Produced (MCF)31401
GOR7245
GOR DeterminationBOE
Average BOE per Day26.785
Average MCFE per Day155.369

 Federal Financial Assurance  i 

 Tribal Well  i No