Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35071
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:WALCKER #AC17-64HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:427673LocationID:427667
County:WELD #123Location:NWSW 17 7N63W 6
Field:WATTENBERG - #90750Elevation:4804 ft.
Planned Location:1980FSL  275 FWLLat/Long: 40.572230 / -104.469480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.572240 / -104.469500Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/12/2012
End Date: 6/12/2012
Reported: 8/24/2012
Days to report: 73
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 10965 ft.    Vertical TD: 6753 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/9/2014
Prop Depth/Form:10997 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 660 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 330, Top: 0 ft., Bottom: 660 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7131 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 499, Top: , Bottom: 7131 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 10997 ft., Depth: 6943 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/7/2012
Spud Date:4/28/2012Spud Date Is:ACTUAL
Measured TD:10965 ft.Measured PB depth:10952 ft.
True Vertical TD:6753 ft.True Vertical PB depth:6740 ft.
Top PZ Location:Sec:17 Twp: 7N 63WFootage: 1929 FSL  1034 FWLDepth
Bottom Hole Location:Sec:17 Twp: 7N 63WFootage: 1750 FSL  534 FELDepth
Log Types:CBL/GRL/CCL/VDL.
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 24 ft., Depth: 124 ft., Weight: 84.00 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 764 ft., Weight: 36.00 , Citings Type: ACTUAL
Cement:Sacks: 336, Top: 0 ft., Bottom: 774 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 24 ft., Depth: 7160 ft., Weight: 26.00 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 710 ft., Bottom: 7169 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7039 ft., Depth: 10955 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2649 ft.
PARKMAN3700 ft.
SUSSEX4477 ft.
SHANNON5138 ft.
NIOBRARA6676 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7330 ft.    Interval Bottom: 10944 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/25/2012Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2012Treatment End Date:6/11/2012
Treatment Summary:Frac'd the Niobrara w/ 2564999 gals of Vistar and Slick Water with 3,552,125#'s of Ottawa sand.
Total fluid used in treatment (bbls):12605Max pressure during treatment (psi):6341
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):64980Total flowback volume recovered (bbls):6014
Fresh water used in treatment (bbls):61071Disposition method For flowback:RECYCLE
Total proppant used (lbs):3609468Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7042 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 261
BBLS_OIL 325
BTU_GAS 1110
CALC_BBLS_H2O 261
CALC_BBLS_OIL 325
CALC_GOR 2153
CALC_MCF_GAS 700
CASING_PRESS 180
GRAVITY_OIL 39
MCF_GAS 700
Perforation Data:
Interval Top:7330 ft.# Of Holes:0
Interval Bottom:10944 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)1605
Total Gas Produced (MCF)3848
GOR2397
GOR DeterminationBOE
Average BOE per Day6.160
Average MCFE per Day35.741

 Federal Financial Assurance  i 

 Tribal Well  i No