|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/29/2023 Measured TD: 8328 ft. Vertical TD: 8226 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/29/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/30/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 1980 FNL 1980 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1980 FNL 1980 FWL | | Proposed Depth/Form: | 8572 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8572 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8572 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/23/2012 | | Spud Date: | 7/22/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8328 ft. | Measured PB depth: | 3885 ft. | | True Vertical TD: | 8226 ft. | True Vertical PB depth: | 3824 ft. | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1989 FNL 2027 FWL | | Log Types: | LOGS TO BE SUBMITTED WITH THE 01 WELLBORE. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8285 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 8024 ft., Bottom: 8285 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4515 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 2425 ft., Bottom: 4515 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 881 ft., Depth: 8328 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 3885 ft., Depth: , Bottom: 4158 ft., Sacks: 175, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 4178 ft., Depth: , Bottom: 4828 ft., Sacks: 215, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 7275 ft., Depth: , Bottom: 7806 ft., Sacks: 100, Method: | | No formation data to display. |
Sidetrack #01 Wellbore Classification: GW Status: AB - 12/29/2023 Measured TD: 8297 ft. Vertical TD: 8196 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: GW AB - 12/29/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/30/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 1822 FNL 2122 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1822 FNL 2122 FWL | | Proposed Depth/Form: | 8057 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8057 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8057 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/4/2012 | | Spud Date: | 7/22/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8297 ft. | Measured PB depth: | 8254 ft. | | True Vertical TD: | 8196 ft. | True Vertical PB depth: | 8153 ft. | | Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 1812 FNL 2122 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1820 FNL 2140 FWL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8285 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 2430 ft., Bottom: 8285 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4185 ft. | 4387 ft. | | | | SUSSEX | 4578 ft. | 4828 ft. | | | | NIOBRARA | 7431 ft. | | | | | FORT HAYS | 7710 ft. | | | | | CODELL | 7753 ft. | | | | | J SAND | 8162 ft. | | | | | DAKOTA | 8371 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 7/11/2013 Interval Top: 7756 ft. Interval Bottom: 7776 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/10/2013 | Treatment End Date: | 6/10/2013 | | Treatment Summary: | 4603 BBL SLICKWATER, 4603 BBL TOTAL FLUID.
155040# 40/70 SAND, 4000# 20/40 SAND, 159040# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4603 | Max pressure during treatment (psi): | 6928 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 337 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 159040 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7756 ft. | # Of Holes: | 60 | | Interval Bottom: | 7776 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/29/2023 Interval Top: 7532 ft. Interval Bottom: 7776 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 44 | | BTU_GAS | 1144 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 3045 | | CALC_MCF_GAS | 134 | | CASING_PRESS | 1690 | | GRAVITY_OIL | 45 | | MCF_GAS | 134 |
| | Perforation Data: | | Interval Top: | 7532 ft. | # Of Holes: | 120 | | Interval Bottom: | 7776 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 7/11/2013 Interval Top: 7532 ft. Interval Bottom: 7618 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/21/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/10/2013 | Treatment End Date: | 6/10/2013 | | Treatment Summary: | 5488 BBL SLICKWATER, 6 BBL ACID, 5494 BBL TOTAL FLUID.
199620# 40/70 SAND, 199620# TOTAL SAND. | | Total fluid used in treatment (bbls): | 5494 | Max pressure during treatment (psi): | 7312 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 337 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 199620 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7532 ft. | # Of Holes: | 60 | | Interval Bottom: | 7618 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/29/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|