|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 12/29/2023 Measured TD: 8336 ft. Vertical TD: 8217 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 12/29/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/30/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 1320 FNL 50 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1320 FNL 50 FWL | | Proposed Depth/Form: | 8359 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24.0 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: , Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8359 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8359 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/9/2012 | | Spud Date: | 8/5/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8336 ft. | Measured PB depth: | 8018 ft. | | True Vertical TD: | 8217 ft. | True Vertical PB depth: | 7899 ft. | | Top PZ Location: | Sec:29 Twp: 2N 67W | Footage: 1292 FNL 37 FWL | | Bottom Hole Location: | Sec:29 Twp: 2N 67W | Footage: 1309 FNL 44 FWL | | Log Types: | PRE FORM 5 | | Log Types: | NEUTRON DENSITY RESISTIVITY LOG, LAS-TRIPLE COMBINATION, CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 878 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 730, Top: 0 ft., Bottom: 878 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8327 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 8030 ft., Bottom: 8327 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8020 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1010, Top: 950 ft., Bottom: 8020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4600 ft. | 4828 ft. | | | | SHANNON | 5126 ft. | | | | | NIOBRARA | 7452 ft. | | | | | FORT HAYS | 7731 ft. | | | | | CODELL | 7751 ft. | | | | | J SAND | 8162 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 9/30/2013 Interval Top: 7752 ft. Interval Bottom: 7772 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/14/2013 | Treatment End Date: | 6/14/2013 | | Treatment Summary: | 4816 BBL SLICKWATER, 4816 BBL TOTAL FLUID.
154220# 40/70 SAND, 4000# 20/40 SAND, 158220# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4816 | Max pressure during treatment (psi): | 4771 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 390 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 158220 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7752 ft. | # Of Holes: | 60 | | Interval Bottom: | 7772 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 12/29/2023 Interval Top: 7528 ft. Interval Bottom: 7772 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 44 | | BTU_GAS | 1144 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 250 | | CALC_MCF_GAS | 11 | | CASING_PRESS | 783 | | GRAVITY_OIL | 45 | | MCF_GAS | 11 |
| | Perforation Data: | | Interval Top: | 7528 ft. | # Of Holes: | 118 | | Interval Bottom: | 7772 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 9/30/2013 Interval Top: 7528 ft. Interval Bottom: 7618 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/14/2013 | Treatment End Date: | 6/14/2013 | | Treatment Summary: | 6010 BBL SLICKWATER, 6 BBL ACID, 6016 BBL TOTAL FLUID.
204480# 40/70 SAND, 4000# 20/40 SAND, 208480# TOTAL SAND. | | Total fluid used in treatment (bbls): | 6016 | Max pressure during treatment (psi): | 5323 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 390 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 208480 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7528 ft. | # Of Holes: | 58 | | Interval Bottom: | 7618 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/29/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|