|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2020 Measured TD: 8325 ft. Vertical TD: 7762 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/30/2014 | Prop Depth/Form: | 8280 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 288, Top: 0 ft., Bottom: 700 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: , Bottom: 8280 ft. |
| | |
Wellbore Completed | Completion Date: | 4/11/2012 | Spud Date: | 4/6/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8325 ft. | Measured PB depth: | 8270 ft. | True Vertical TD: | 7762 ft. | True Vertical PB depth: | 7707 ft. | Top PZ Location: | Sec:14 Twp: 4N 65W | Footage: 2625 FSL 78 FEL | Depth | Bottom Hole Location: | Sec:14 Twp: 4N 65W | Footage: 2598 FSL 70 FEL | Depth | Log Types: | CBL, Triple Combo | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 794 ft., Weight: 24.00 , Citings Type: ACTUAL | Cement: | Sacks: 279, Top: 0 ft., Bottom: 803 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8315 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 610, Top: 1915 ft., Bottom: 8325 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 3008 ft. | | | | PARKMAN | 4088 ft. | | | | SUSSEX | 4885 ft. | | | | SHANNON | 5554 ft. | | | | NIOBRARA | 7311 ft. | | | | FORT HAYS | 7618 ft. | | | | CODELL | 7640 ft. | | | | MOWRY | 8088 ft. | | | | J SAND | 8104 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 10/1/2020 Interval Top: 8107 ft. Interval Bottom: 8174 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/13/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 5/11/2012 | Treatment Summary: | Pumped 282,316 lbs of Ottawa Proppant, 14,369 lbs of SB Excel Proppant and 153,374 gallons of AMP.
The J-Sand was SI because of CBP during first test of Niobrara and Codell on 6/15/2012, all plugs cleared out on 7/11/2012 so there was a commingle.
Niobrara, Codell, and J-Sand all tested together on 7/18/2012. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8107 ft. | # Of Holes: | 100 | Interval Bottom: | 8174 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/5/2012 Interval Top: 7642 ft. Interval Bottom: 7658 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/11/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 5/14/2012 | Treatment Summary: | Pumped 245,121 lbs of Preferred Rock Proppant and 119,436 gallons of 15% HCL, Slick Water, and Silverstim.
Commingle the Niobrara and Codell. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7642 ft. | # Of Holes: | 64 | Interval Bottom: | 7658 ft. | Hole Size: | 0.44 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/18/2012 Interval Top: 7349 ft. Interval Bottom: 8174 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/13/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8087 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/18/2012 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 20 | BTU_GAS | 1184 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 20 | CALC_GOR | 20050 | CALC_MCF_GAS | 401 | CASING_PRESS | 1790 | GRAVITY_OIL | 57 | MCF_GAS | 401 | TUBING_PRESS | 1249 |
| Perforation Data: | Interval Top: | 7349 ft. | # Of Holes: | 212 | Interval Bottom: | 8174 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: PR - 10/1/2020 Interval Top: 7349 ft. Interval Bottom: 7658 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/11/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7349 ft. | # Of Holes: | 112 | Interval Bottom: | 7658 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/5/2012 Interval Top: 7349 ft. Interval Bottom: 7460 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/11/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/9/2012 | Treatment End Date: | 6/9/2012 | Treatment Summary: | Pumped 251,981 lbs of Preferred Rock Proppant and 157,926 gallons of Slick Water and Silverstim.
Commingle the Niobrara and Codell. | Total fluid used in treatment (bbls): | 3760 | Max pressure during treatment (psi): | 4808 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 7 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 251981 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7349 ft. | # Of Holes: | 48 | Interval Bottom: | 7460 ft. | Hole Size: | 0.69 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 209 |
Total Gas Produced (MCF) | 6011 |
GOR | 28760 |
GOR Determination | MCFE |
Average BOE per Day | 3.395 |
Average MCFE per Day | 19.695 |
Federal Financial Assurance | i | |
|
|