|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/2/2024 Measured TD: 8478 ft. Vertical TD: 8234 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/2/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/14/2014 | Proposed Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 1321 FSL 31 FWL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1330 FSL 37 FWL | Proposed Depth/Form: | 8452 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 265, Top: 0 ft., Bottom: 725 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8452 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 179, Top: 7336 ft., Bottom: 8452 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5398 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 157, Top: 4250 ft., Bottom: 5398 ft. |
| | |
Wellbore Completed | Completion Date: | 2/20/2013 | Spud Date: | 2/15/2013 | Spud Date Is: | ACTUAL | Measured TD: | 8478 ft. | Measured PB depth: | 8446 ft. | True Vertical TD: | 8234 ft. | True Vertical PB depth: | 8202 ft. | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 1321 FSL 31 FWL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 1330 S 37 W | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 755 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 320, Top: 0 ft., Bottom: 755 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8467 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 3100 ft., Bottom: 8478 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8467 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 115, Top: 1700 ft., Bottom: 1770 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 8467 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 115, Top: 2310 ft., Bottom: 3107 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 8467 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 130, Top: 248 ft., Bottom: 470 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4562 ft. | | | | NIOBRARA | 7587 ft. | | | | CODELL | 7937 ft. | | | | J SAND | 8364 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/2/2024 Interval Top: 8367 ft. Interval Bottom: 8400 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/18/2013 | Treatment End Date: | 4/19/2013 | Treatment Summary: | Frac'd the J Sand with 109,680# 40/70 sand and 114,198 gals SLF. 04-18-13 | Total fluid used in treatment (bbls): | 2719 | Max pressure during treatment (psi): | 3133 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.52 | Recycled water used in treatment (bbls): | 2719 | Total flowback volume recovered (bbls): | 395 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 109680 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8367 ft. | # Of Holes: | 75 | Interval Bottom: | 8400 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/30/2013 Interval Top: 7938 ft. Interval Bottom: 7953 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/19/2013 | Treatment End Date: | 4/20/2013 | Treatment Summary: | Set CFP @ 8003'. 04-19-13
Frac'd the Codell with 109,585# 40/70 with 113,106 gals SLF. 04-19-13 | Total fluid used in treatment (bbls): | 2693 | Max pressure during treatment (psi): | 6148 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.69 | Recycled water used in treatment (bbls): | 2693 | Total flowback volume recovered (bbls): | 395 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 109585 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7938 ft. | # Of Holes: | 45 | Interval Bottom: | 7953 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/12/2013 Interval Top: 7699 ft. Interval Bottom: 8400 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/12/2013 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7650'. 04-24-13
Drilled out CBP, CFP's to commingle the JSND-CDL-NBRR. 04-27-13 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8346 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/12/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 88 | BBLS_OIL | 41 | BTU_GAS | 1168 | CALC_BBLS_H2O | 88 | CALC_BBLS_OIL | 41 | CALC_GOR | 8732 | CALC_MCF_GAS | 358 | CASING_PRESS | 1192 | GRAVITY_OIL | 49 | MCF_GAS | 358 | TUBING_PRESS | 359 |
| Perforation Data: | Interval Top: | 7699 ft. | # Of Holes: | 184 | Interval Bottom: | 8400 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/2/2024 Interval Top: 7699 ft. Interval Bottom: 7953 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7699 ft. | # Of Holes: | 109 | Interval Bottom: | 7953 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/30/2013 Interval Top: 7699 ft. Interval Bottom: 7715 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/9/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/19/2013 | Treatment End Date: | 4/20/2013 | Treatment Summary: | Set CFP @ 7765'. 04-19-13
Frac'd the Niobrara with 109,449# 40/70 with 112,140 gals SLF. 04-20-13 | Total fluid used in treatment (bbls): | 2670 | Max pressure during treatment (psi): | 6013 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 2670 | Total flowback volume recovered (bbls): | 395 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 109449 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7699 ft. | # Of Holes: | 64 | Interval Bottom: | 7715 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/02/2024 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|