|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/30/2022 Measured TD: 8460 ft. Vertical TD: 8267 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/30/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/14/2014 | | Proposed Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 50 FSL 1200 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 50 FSL 1200 FWL | | Proposed Depth/Form: | 8440 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 725 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8440 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 7324 ft., Bottom: 8440 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5417 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 155, Top: 4290 ft., Bottom: 5417 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/15/2013 | | Spud Date: | 2/8/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8460 ft. | Measured PB depth: | 8404 ft. | | True Vertical TD: | 8267 ft. | True Vertical PB depth: | 8211 ft. | | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 36 FSL 1160 FWL | | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 45 FSL 1154 FWL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 755 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 765 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8449 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 200 ft., Bottom: 8460 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4540 ft. | | | | | NIOBRARA | 7549 ft. | | | | | CODELL | 7903 ft. | | | | | J SAND | 8330 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 12/8/2022 Interval Top: 8333 ft. Interval Bottom: 8361 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/9/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/18/2013 | Treatment End Date: | 4/19/2013 | | Treatment Summary: | Pumped the J Sand from 0.25# to 2.0# slickwater with 109,500# 40/70 sand and 104,496 gals SLF. 04-18-13 | | Total fluid used in treatment (bbls): | 2488 | Max pressure during treatment (psi): | 3464 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.73 | | Recycled water used in treatment (bbls): | 2488 | Total flowback volume recovered (bbls): | 404 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 109500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8333 ft. | # Of Holes: | 66 | | Interval Bottom: | 8361 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/30/2013 Interval Top: 7904 ft. Interval Bottom: 7921 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/9/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/19/2013 | Treatment End Date: | 4/20/2013 | | Treatment Summary: | Set CFP @ 7971'. 04-19-13
Frac'd the Codell with 109,420# 40/70 with 112,098 gals SLF. 04-19-13 | | Total fluid used in treatment (bbls): | 2669 | Max pressure during treatment (psi): | 6214 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 2669 | Total flowback volume recovered (bbls): | 404 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 109420 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7904 ft. | # Of Holes: | 42 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/18/2013 Interval Top: 7665 ft. Interval Bottom: 8339 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/9/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/18/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set CBP @ 7575'. 04-27-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 04-29-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8306 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/18/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 67 | | BBLS_OIL | 30 | | BTU_GAS | 1168 | | CALC_BBLS_H2O | 67 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 1554 | | GRAVITY_OIL | 48 | | MCF_GAS | 90 | | TUBING_PRESS | 135 |
| | Perforation Data: | | Interval Top: | 7665 ft. | # Of Holes: | 164 | | Interval Bottom: | 8339 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/8/2022 Interval Top: 7665 ft. Interval Bottom: 7921 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/9/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7665 ft. | # Of Holes: | 98 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/30/2013 Interval Top: 7665 ft. Interval Bottom: 7679 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/9/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/19/2013 | Treatment End Date: | 4/20/2013 | | Treatment Summary: | Set CFP @ 7730'. 04-19-13
Frac'd the Niobrara with 109,880# 40/70 with 116,172 gals SLF. 04-19-13 | | Total fluid used in treatment (bbls): | 2766 | Max pressure during treatment (psi): | 5491 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.45 | | Recycled water used in treatment (bbls): | 2766 | Total flowback volume recovered (bbls): | 404 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 109880 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7665 ft. | # Of Holes: | 56 | | Interval Bottom: | 7679 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/08/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|