Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34900
Well Classification: OW Status: PR - 12/1/2019
Well Name/No:WEISS #3N-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2019
FacilityID:427212LocationID:333181
County:WELD #123Location:SWSW 33 3N66W 6
Field:WATTENBERG - #90750Elevation:4914 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:712FSL  646 FWLLat/Long: 40.176158 / -104.789317Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176163 / -104.789320Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/21/2012
End Date: 10/21/2012
Reported: 12/20/2012
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2019             Measured TD: 11878 ft.    Vertical TD: 7253 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/5/2014
Proposed Top PZ Location:Sec:33 Twp: 3N 66W Footage: 774 FSL  1863 FWL
Bottom Hole Location:Sec:33 Twp: 3N 66W Footage: 485 FNL  2025 FWL
Proposed Depth/Form:11970 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: E/2W/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 700 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 700 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7761 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 760, Top: , Bottom: 7761 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6706 ft., Depth: 11970 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/2/2012
Spud Date:3/26/2012Spud Date Is:ACTUAL
Measured TD:11878 ft.Measured PB depth:11853 ft.
True Vertical TD:7253 ft.True Vertical PB depth:7252 ft.
Top PZ Location:Sec:33 Twp: 3N 66WFootage: 774 FSL  1863 FWL
Bottom Hole Location:Sec:33 Twp: 3N 66WFootage: 485 FNL  2025 FWL
Log Types:PRE FORM 5
Log Types:CBL; MUD LOGMWD: NFE-GR
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 718 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7856 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 830 ft., Bottom: 7856 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6713 ft., Depth: 11863 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7257 ft.
NIOBRARA7360 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2019                 Interval Top: 7893 ft.    Interval Bottom: 11878 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/4/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/20/2012Treatment End Date:10/21/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7893-11878. 894800# 40/70, 2003080# 30/50, 152300 SB EXCEL, 3050180# TOTAL SAND. 31647 BBL FR WATER, 797 BBL LINEAR GEL, 31259 BBL PERMSTIM, 63703 BBL TOTAL FLUID.
Total fluid used in treatment (bbls):63703Max pressure during treatment (psi):8055
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5243
Fresh water used in treatment (bbls):31647Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3050180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7373 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/27/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 369
BTU_GAS 1219
CALC_BBLS_OIL 369
CALC_GOR 2786
CALC_MCF_GAS 1028
CASING_PRESS 2093
GRAVITY_OIL 50
MCF_GAS 1028
TUBING_PRESS 1220
Perforation Data:
Interval Top:7893 ft.# Of Holes:0
Interval Bottom:11878 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5173
Total Gas Produced (MCF)42701
GOR8254
GOR DeterminationBOE
Average BOE per Day34.364
Average MCFE per Day199.315

 Federal Financial Assurance  i 

 Tribal Well  i No