Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34851
Well Classification: OW Status: SI - 4/1/2024
Well Name/No:GRIGSBY AC #19-62HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2024
FacilityID:427068LocationID:427074
County:WELD #123Location:NENE 30 7N63W 6
Field:WATTENBERG - #90750Elevation:4756 ft.
Planned Location:253FNL  246 FELLat/Long: 40.551470 / -104.471280Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.551470 / -104.471290Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/17/2012
End Date: 7/17/2012
Reported: 9/28/2012
Days to report: 73
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 4/1/2024             Measured TD: 11010 ft.    Vertical TD: 6794 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 4/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/26/2013
Prop Depth/Form:11024 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: UNSPACED , Unit Acreage: 160, Drill Unit: S/2S/2
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: , Bottom: 0 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 525 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 264, Top: 0 ft., Bottom: 525 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7264 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 525, Top: , Bottom: 7264 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7082 ft., Depth: 11024 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/17/2012
Spud Date:6/9/2012Spud Date Is:Actual
Measured TD:11010 ft.Measured PB depth:10970 ft.
True Vertical TD:6794 ft.True Vertical PB depth:6754 ft.
Top PZ Location:Sec:19 Twp: 7N 63WFootage: 627 FSL  892 FELDepth
Bottom Hole Location:Sec:19 Twp: 7N 63WFootage: 631 FSL  784 FWLDepth
Log Types:CBL GR Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 84.0 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 624 ft., Weight: 36.00 , Citings Type: ACTUAL
Cement:Sacks: 314, Top: 0 ft., Bottom: 624 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7302 ft., Weight: 26.00 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 98 ft., Bottom: 7302 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7218 ft., Depth: 11010 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2692 ft.
PARKMAN3748 ft.
SUSSEX4517 ft.
SHANNON5202 ft.
NIOBRARA6839 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 4/1/2024                  Interval Top: 7426 ft.    Interval Bottom: 10909 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/11/2012Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/16/2012Treatment End Date:7/16/2012
Treatment Summary:Frac'd the Niobrara w/ 2637061 gals of Vistar and Slick Water with 3,848,124#'s of Ottawa sand.
Total fluid used in treatment (bbls):129689Max pressure during treatment (psi):6893
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):66902Total flowback volume recovered (bbls):14587
Fresh water used in treatment (bbls):62787Disposition method For flowback:RECYCLE
Total proppant used (lbs):379480Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7237 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 323
BBLS_OIL 425
BTU_GAS 1117
CALC_BBLS_H2O 323
CALC_BBLS_OIL 425
CALC_GOR 905
CALC_MCF_GAS 385
CASING_PRESS 862
GRAVITY_OIL 39
MCF_GAS 385
Perforation Data:
Interval Top:7426 ft.# Of Holes:0
Interval Bottom:10909 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)2001
Total Gas Produced (MCF)2510
GOR1254
GOR DeterminationBOE
Average BOE per Day6.628
Average MCFE per Day38.424

 Federal Financial Assurance  i 

 Tribal Well  i No