Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34830
Well Classification: OW Status: SI - 2/1/2021
Well Name/No:GOBBLER #37N-W22HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2021
FacilityID:427031LocationID:427021
County:WELD #123Location:NWNE 22 2N66W 6
Field:WATTENBERG - #90750Elevation:5053 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:400FNL  2010 FELLat/Long: 40.129807 / -104.761085Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.129815 / -104.761077Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/17/2012
End Date: 6/17/2012
Reported: 7/31/2012
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 2/1/2021             Measured TD: 11724 ft.    Vertical TD: 7300 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 2/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/20/2013
Proposed Top PZ Location:Sec:22 Twp: 2N 66W Footage: 630 FNL  1828 FEL
Bottom Hole Location:Sec:22 Twp: 2N 66W Footage: 460 FSL  1828 FEL
Proposed Depth/Form:11821 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: W/2E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7642 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 7642 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6566 ft., Depth: 11821 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/23/2012
Spud Date:4/7/2012Spud Date Is:ACTUAL
Measured TD:11724 ft.Measured PB depth:11697 ft.
True Vertical TD:7300 ft.True Vertical PB depth:7273 ft.
Top PZ Location:Sec:22 Twp: 2N 66WFootage: 810 FNL  1820 FEL
Bottom Hole Location:Sec:22 Twp: 2N 66WFootage: 461 FSL  1825 FEL
Log Types:PRELIMINARY FORM 5
Log Types:CBL; LPLOT VH; WS; AC-TR-SD-DSN; CS-NGR; BV;
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1018 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 16 ft., Bottom: 1018 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7754 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 450 ft., Bottom: 7754 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6602 ft., Depth: 11707 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7278 ft.
NIOBRARA7460 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 2/1/2021                  Interval Top: 7784 ft.    Interval Bottom: 11638 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/11/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/16/2012Treatment End Date:6/17/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER from 7784-11638. AVERAGE TREATING PRESSURE 5288, AVERAGE RATE 59.6, TOTAL BBLS OF FLUID 68216. 1011240# 40/70, 2141960# 30/50, 152016# CRC 20/40, TOTAL SAND WEIGHT 3305217#.
Total fluid used in treatment (bbls):68216Max pressure during treatment (psi):7327
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):36546Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3305217Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7244 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/16/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 241
BTU_GAS 1354
CALC_BBLS_OIL 241
CALC_GOR 1471
CALC_MCF_GAS 355
CASING_PRESS 2159
GRAVITY_OIL 46
MCF_GAS 355
TUBING_PRESS 1787
Perforation Data:
Interval Top:7784 ft.# Of Holes:0
Interval Bottom:11638 ft.Hole Size:0 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
01/31/2021
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No