Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34827
Well Classification: OW Status: PA - 8/26/2025
Well Name/No:GOBBLER #37N-E22HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/26/2025
FacilityID:427023LocationID:427021
County:WELD #123Location:NWNE 22 2N66W 6
Field:WATTENBERG - #90750Elevation:5052 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:400FNL  1980 FELLat/Long: 40.129807 / -104.760978Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.129812 / -104.760969Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2012
End Date: 6/15/2012
Reported: 7/25/2012
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/26/2025             Measured TD: 11741 ft.    Vertical TD: 7312 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/26/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/20/2013
Proposed Top PZ Location:Sec:22 Twp: 2N 66W Footage: 785 FNL  1490 FEL
Bottom Hole Location:Sec:22 Twp: 2N 66W Footage: 488 FSL  1503 FEL
Proposed Depth/Form:11854 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 980 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7666 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 730, Top: , Bottom: 7666 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6601 ft., Depth: 11854 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/18/2012
Spud Date:4/23/2012Spud Date Is:ACTUAL
Measured TD:11741 ft.Measured PB depth:11726 ft.
True Vertical TD:7312 ft.True Vertical PB depth:7312 ft.
Top PZ Location:Sec:22 Twp: 2N 66WFootage: 785 FNL  1490 FEL
Bottom Hole Location:Sec:22 Twp: 2N 66WFootage: 488 FSL  1503 FEL
Log Types:CBL; CS-NGR; NFE-GR; LPLOT VH
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1008 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1008 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7738 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 570 ft., Bottom: 7738 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6633 ft., Depth: 11726 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7305 ft.
NIOBRARA7410 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 8/26/2025                 Interval Top: 7771 ft.    Interval Bottom: 11655 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/11/2012Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/14/2012Treatment End Date:6/15/2012
Treatment Summary:FRAC'D THROUGH AN OPEN HOLE LINER FROM 7771-11655. AVERAGE TREATING PRESSURE 4668, AVERAGE RATE 60, TOTAL BBLS OF FLUID 69327. 1010780# 40/70, 2141240# 30/50, 152260# CRC 20/40, TOTAL SAND WEIGHT 3304280#.
Total fluid used in treatment (bbls):69327Max pressure during treatment (psi):7246
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):36877Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3304280Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 197
BTU_GAS 1354
CALC_BBLS_OIL 197
CALC_GOR 1774
CALC_MCF_GAS 349
CASING_PRESS 2309
GRAVITY_OIL 46
MCF_GAS 349
TUBING_PRESS 1709
Perforation Data:
Interval Top:7771 ft.# Of Holes:0
Interval Bottom:11655 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/26/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No