Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34773
Well Classification: OW Status: PR - 10/1/2020
Well Name/No:DYER USX AB #35-68-1HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2020
FacilityID:426753LocationID:426749
County:WELD #123Location:NENE 34 7N64W 6
Field:WATTENBERG - #90750Elevation:4871 ft.
Planned Location:352FNL  296 FELLat/Long: 40.536050 / -104.527820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.536060 / -104.527820Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2012
End Date: 5/3/2012
Reported: 7/19/2013
Days to report: 442
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2020             Measured TD: 11361 ft.    Vertical TD: 6936 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/3/2013
Prop Depth/Form:11507 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: WSU , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 392, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7396 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 1087, Top: , Bottom: 7396 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6474 ft., Depth: 11507 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/17/2012
Spud Date:3/9/2012Spud Date Is:ACTUAL
Measured TD:11361 ft.Measured PB depth:11349 ft.
True Vertical TD:6936 ft.True Vertical PB depth:6924 ft.
Top PZ Location:Sec:35 Twp: 7N 64WFootage: 980 FNL  909 FWLDepth
Bottom Hole Location:Sec:35 Twp: 7N 64WFootage: 1001 FNL  534 FELDepth
Log Types:CBL, Gamma, MWD, MUD
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 124 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 839 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7396 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 810 ft., Bottom: 7396 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7274 ft., Depth: 11351 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2794 ft.
PARKMAN3850 ft.
SUSSEX4624 ft.
SHANNON5278 ft.
NIOBRARA7017 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2020                 Interval Top: 7492 ft.    Interval Bottom: 11281 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/17/2012Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:5/2/2012
Treatment Summary:20 stages: Frac'd the Niobrara w/ 2518809 gals of pHaserFrac and Slick Water with 3,807,348#'s of Ottawa sand.
Tubing Size:2.875 in.Tubing Setting Depth:7300 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/25/2012Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 235
BBLS_OIL 406
BTU_GAS 1335
CALC_BBLS_H2O 235
CALC_BBLS_OIL 406
CALC_GOR 938
CALC_MCF_GAS 381
CASING_PRESS 667
GRAVITY_OIL 43
MCF_GAS 381
Perforation Data:
Interval Top:7492 ft.# Of Holes:0
Interval Bottom:11281 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)6006
Total Gas Produced (MCF)26469
GOR4407
GOR DeterminationBOE
Average BOE per Day28.854
Average MCFE per Day167.347

 Federal Financial Assurance  i 

 Tribal Well  i No