Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34764
Well Classification: OW Status: SI - 11/1/2025
Well Name/No:STELLING #3A-4H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:426712LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:WATTENBERG - #90750Elevation:4916 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:684FSL  2013 FWLLat/Long: 40.075200 / -104.671220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075198 / -104.671214Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/13/2012
End Date: 8/13/2012
Reported: 9/20/2012
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2025             Measured TD: 11684 ft.    Vertical TD: 7044 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2013
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 816 FSL  1681 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 460 FNL  1242 FWL
Proposed Depth/Form:11735 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 970 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 970 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7455 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 911, Top: 500 ft., Bottom: 7455 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11735 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 377, Top: 7155 ft., Bottom: 11735 ft.

Wellbore Completed
Completion Date:6/23/2012
Spud Date:6/7/2012Spud Date Is:ACTUAL
Measured TD:11684 ft.Measured PB depth:11574 ft.
True Vertical TD:7044 ft.True Vertical PB depth:7045 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 794 FSL  1470 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 481 FNL  1411 FWL
Log Types:Isolation Scanner Cement Evaluation, Gamma Ray-CCL, TVD Build, MD Build
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1001 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 382, Top: 0 ft., Bottom: 1001 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7492 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 1650 ft., Bottom: 7507 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11664 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 7000 ft., Bottom: 11684 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7049 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2025                 Interval Top: 7555 ft.    Interval Bottom: 11557 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/8/2012Treatment End Date:8/12/2012
Treatment Summary:Stages 1-15 treated with a total of 26,456 bbls slickwater.
Total fluid used in treatment (bbls):26456Max pressure during treatment (psi):7730
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):26456Total flowback volume recovered (bbls):8450
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):4777785Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 154
BBLS_OIL 347
BTU_GAS 1142
CALC_BBLS_H2O 154
CALC_BBLS_OIL 347
CALC_GOR 1127
CALC_MCF_GAS 391
CASING_PRESS 1755
GRAVITY_OIL 45
MCF_GAS 391
TUBING_PRESS 1411
Perforation Data:
Interval Top:7555 ft.# Of Holes:891
Interval Bottom:11557 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)500
Total Gas Produced (MCF)155
GOR310
GOR DeterminationBOE
Average BOE per Day1.439
Average MCFE per Day8.342

 Federal Financial Assurance  i 

 Tribal Well  i No