Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34750
Well Classification: GW Status: PR - 6/1/2020
Well Name/No:SHELEY #3A-4H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2020
FacilityID:426640LocationID:330754
Municipality/County:FIRESTONE / WELD #123Location:SWSW 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:667FSL  847 FWLLat/Long: 40.161970 / -104.901450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.162031 / -104.901465Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/28/2013
End Date: 1/30/2013
Reported: 5/24/2013
Originally Reported: 5/23/2013
Days to report: 114
Days to report: 113
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2020             Measured TD: 11695 ft.    Vertical TD: 7272 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/26/2013
Proposed Top PZ Location:Sec:4 Twp: 2N 67W Footage: 782 FSL  568 FWL
Bottom Hole Location:Sec:4 Twp: 2N 67W Footage: 696 FSL  464 FEL
Proposed Depth/Form:11825 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7625 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 933, Top: 500 ft., Bottom: 7625 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11825 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/17/2012
Spud Date:9/28/2012Spud Date Is:ACTUAL
Measured TD:11695 ft.Measured PB depth:11685 ft.
True Vertical TD:7272 ft.True Vertical PB depth:7232 ft.
Top PZ Location:Sec:4 Twp: 2N 67WFootage: 782 FSL  568 FWL
Bottom Hole Location:Sec:4 Twp: 2N 67WFootage: 696 FSL  464 FEL
Log Types:VDL Gamma-Ray Radial Bond Log
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 832 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 842 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7513 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 605, Top: 0 ft., Bottom: 7526 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11685 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4381 ft.
SHANNON4954 ft.
TEEPEE BUTTES6590 ft.
SHARON SPRINGS7301 ft.
NIOBRARA7487 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 6/1/2020                  Interval Top: 7649 ft.    Interval Bottom: 11575 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/20/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/28/2013Treatment End Date:1/29/2013
Treatment Summary:Stages 1-17 treated with a total of 3,194,278 # sand and 66,223 fluids.
Total fluid used in treatment (bbls):66223Max pressure during treatment (psi):8037
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):66223Total flowback volume recovered (bbls):2105
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3194278Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6905 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/28/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 341
BTU_GAS 1271
CALC_BBLS_H2O 93
CALC_BBLS_OIL 341
CALC_GOR 2140
CALC_MCF_GAS 730
CASING_PRESS 1244
GRAVITY_OIL 49
MCF_GAS 730
TUBING_PRESS 1202
Perforation Data:
Interval Top:7649 ft.# Of Holes:102
Interval Bottom:11575 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1686
Total Gas Produced (MCF)28456
GOR16877
GOR DeterminationMCFE
Average BOE per Day18.065
Average MCFE per Day104.761

 Federal Financial Assurance  i 

 Tribal Well  i No