Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34697
Well Classification: OW Status: PR - 12/1/2018
Well Name/No:Dunn #1-13H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RED HAWK PETROLEUM LLC - 10503
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2018
FacilityID:426457LocationID:426458
County:WELD #123Location:NWNW 13 8N62W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5032 ft.
Planned Location:250FNL  660 FWLLat/Long: 40.668152 / -104.274751Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.668145 / -104.274755Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/23/2012
End Date: 1/23/2012
Reported: 3/14/2012
Prior to rule 205A.b.(2)(A)
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2018             Measured TD: 15625 ft.    Vertical TD: 6752 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/14/2013
Prop Depth/Form:16178 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-51 , Unit Acreage: 1280, Drill Unit: Sec 13 & 24
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 50 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 535 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 229, Top: 0 ft., Bottom: 535 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6982 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 594, Top: 0 ft., Bottom: 6982 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6181 ft., Depth: 16178 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:1/14/2012
Spud Date:12/21/2011Spud Date Is:ACTUAL
Measured TD:15625 ft.Measured PB depth:15616 ft.
True Vertical TD:6752 ft.True Vertical PB depth:6750 ft.
Top PZ Location:Sec:13 Twp: 8N 62WFootage: 763 FNL  676 FWLDepth
Bottom Hole Location:Sec:24 Twp: 8N 62WFootage: 4066 FNL  929 FWLDepth
Log Types:CBL & Mud Log
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 7, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 525 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6986 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 760 ft., Bottom: 6986 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6165 ft., Depth: 15616 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6530 ft.
NIOBRARA6572 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2018                 Interval Top: 6985 ft.    Interval Bottom: 15616 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/20/2012Choke Size:22.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/23/2012
Treatment Summary:Pumped 35 stage frac job via plug and perf. Average rate was 49 bpm. Max rate was 57 bpm. Average pressure was 4172 psi. Max pressure was 6766 psi. Totals: Water - 119,044 bbls; 40/70 sand - 685,852 lbs.; 20/40 sand - 5,306,522 lbs.; 20/40 resin - 1,094,594 lbs.
Tubing Size:2.875 in.Tubing Setting Depth:6100 ft.
Tubing Packer Depth:6100 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/11/2012Test Method:production
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 731
BBLS_OIL 238
CALC_BBLS_H2O 731
CALC_BBLS_OIL 238
CALC_GOR 105
CALC_MCF_GAS 25
CASING_PRESS 150
GRAVITY_OIL 35
MCF_GAS 25
TUBING_PRESS 320
Perforation Data:
Interval Top:6985 ft.# Of Holes:1224
Interval Bottom:15616 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)3255
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day8.899
Average MCFE per Day51.615

 Federal Financial Assurance  i 

 Tribal Well  i No