|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2021 Measured TD: 7990 ft. Vertical TD: 7921 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/12/2013 | Proposed Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2541 FEL | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2543 FEL | Proposed Depth/Form: | 7946 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 255, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7946 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 168, Top: 6903 ft., Bottom: 7946 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4633 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 83, Top: 4033 ft., Bottom: 4633 ft. |
| | |
Wellbore Completed | Completion Date: | 1/31/2013 | Spud Date: | 1/26/2013 | Spud Date Is: | ACTUAL | Measured TD: | 7990 ft. | Measured PB depth: | 7949 ft. | True Vertical TD: | 7921 ft. | True Vertical PB depth: | 7880 ft. | Top PZ Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2541 FEL | Bottom Hole Location: | Sec:35 Twp: 3N 67W | Footage: 37 FNL 2543 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 796 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 0 ft., Bottom: 808 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7976 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 2660 ft., Bottom: 7990 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4272 ft. | | | | NIOBRARA | 7128 ft. | | | | CODELL | 7389 ft. | | | | J SAND | 7830 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 7831 ft. Interval Bottom: 7870 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/7/2013 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/1/2013 | Treatment End Date: | 4/3/2013 | Treatment Summary: | Frac'd the J Sand with 102,100# 40/70 sand and 94,569 gals SLF. 04-03-13 | Total fluid used in treatment (bbls): | 2252 | Max pressure during treatment (psi): | 4739 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.68 | Recycled water used in treatment (bbls): | 2252 | Total flowback volume recovered (bbls): | 501 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 102100 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7831 ft. | # Of Holes: | 75 | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7391 ft. Interval Bottom: 7410 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/12/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/3/2013 | Treatment End Date: | 4/3/2013 | Treatment Summary: | Set CFP @ 7458'. 04-03-13
Frac'd the Codell with 98,380# 40/70 # 40/70 sand and 94,252 gals SLF. 04-03-13 | Total fluid used in treatment (bbls): | 2244 | Max pressure during treatment (psi): | 5203 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | 2244 | Total flowback volume recovered (bbls): | 501 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 98380 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7391 ft. | # Of Holes: | 57 | Interval Bottom: | 7410 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/13/2013 Interval Top: 7171 ft. Interval Bottom: 7870 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/12/2013 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/13/2013 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7120'. 04-03-13
Drilled out CBP, CFP's to commingle the JSND-NBRR-CDL. 04-05-13 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7793 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/13/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 157 | BBLS_OIL | 10 | BTU_GAS | 1251 | CALC_BBLS_H2O | 157 | CALC_BBLS_OIL | 10 | CALC_GOR | 35000 | CALC_MCF_GAS | 350 | CASING_PRESS | 2375 | GRAVITY_OIL | 53 | MCF_GAS | 350 | TUBING_PRESS | 309 |
| Perforation Data: | Interval Top: | 7171 ft. | # Of Holes: | 208 | Interval Bottom: | 7870 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 7171 ft. Interval Bottom: 7410 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/12/2013 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7171 ft. | # Of Holes: | 133 | Interval Bottom: | 7410 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7171 ft. Interval Bottom: 7190 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/12/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/3/2013 | Treatment End Date: | 4/3/2013 | Treatment Summary: | Set CFP @ 7240'. 04-03-13
Frac'd the Niobrara with 100,120# 40/70 and 93,017 gals SLF. 04-03-13 | Total fluid used in treatment (bbls): | 2215 | Max pressure during treatment (psi): | 5634 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | 2215 | Total flowback volume recovered (bbls): | 501 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 100120 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7171 ft. | # Of Holes: | 76 | Interval Bottom: | 7190 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|