Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34649
Well Classification: OW Status: PR - 10/1/2019
Well Name/No:BESTWAY #12-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2019
FacilityID:426319LocationID:423325
Municipality/County:GREELEY / WELD #123Location:SENE 2 5N66W 6
Field:WATTENBERG - #90750Elevation:4699 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2223FNL  1180 FELLat/Long: 40.430800 / -104.739270Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.431290 / -104.739270Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/11/2013
End Date: 2/11/2013
Reported: 6/26/2013
Days to report: 135
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2019             Measured TD: 12154 ft.    Vertical TD: 7032 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/1/2014
Proposed Top PZ Location:Sec:2 Twp: 5N 66W Footage: 1340 FNL  460 FEL
Bottom Hole Location:Sec:2 Twp: 5N 66W Footage: 1341 FNL  460 FWL
Proposed Depth/Form:11990 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: Unspaced , Unit Acreage: 40, Drill Unit: SE/4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1227 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 675, Top: 0 ft., Bottom: 1227 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7414 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6217 ft., Bottom: 7414 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7364 ft., Depth: 11990 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/29/2012
Spud Date:6/12/2012Spud Date Is:ACTUAL
Measured TD:12154 ft.Measured PB depth:12154 ft.
True Vertical TD:7032 ft.True Vertical PB depth:7031 ft.
Top PZ Location:Sec:2 Twp: 5N 66WFootage: 1311 FNL  601 FEL
Bottom Hole Location:Sec:2 Twp: 5N 66WFootage: 1352 FNL  470 FWL
Log Types:Mud Log, CBL, Gamma Ray
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1273 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 1273 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7698 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 3042 ft., Bottom: 7698 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6497 ft., Depth: 12144 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7210 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 11/14/2023                Interval Top: 7885 ft.    Interval Bottom: 12046 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/23/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/5/2013Treatment End Date:2/13/2013
Treatment Summary:20 stage fracture treatment. 53,814 bbls total fluid. 3,153,398# of 40/70 & 20/40 Sand.
Total fluid used in treatment (bbls):53814Max pressure during treatment (psi):7894
Total gas used in treatment (mcf):0Fluid density (lbs/gal):0.25
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):43051
Fresh water used in treatment (bbls):48738Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3153398Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 116
BTU_GAS 1301
CALC_BBLS_OIL 116
CALC_GOR 11905
CALC_MCF_GAS 1287
GRAVITY_OIL 54
MCF_GAS 1287
Perforation Data:
Interval Top:7885 ft.# Of Holes:20
Interval Bottom:12046 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No